404227095 | Form 17 | 5/20/2025 | 6/3/2025 | GAS LIFT | 12 | CONTINUOUS | GAS | 1 | WHISPER | 877 | 900 | No | -- | -- | Remediation follow up test. 12 PSI continuous gas flow blew down to 1 PSI within thirty minutes, whisper gas continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 11/3/2024 | 11/12/2024 | | 5 | Continuous | -- | 0 | No Flow | 1348 | 1348 | No | No | No | Annual Test. 5 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403588714 | Form 17 | 11/7/2023 | 11/8/2023 | FLOWING | 28 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 2656 | 2655 | Yes | -- | -- | Post-Production within 30 days of first sales. 28 PSI water and gas flow blew down to 0 PSI within first minute of test, water dripped for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
403418723 | Form 17 | 5/30/2023 | 5/31/2023 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |