Click for Specifics | Full | 4/30/2025 | 5/13/2025 | | 0 | No Flow | -- | 0 | No Flow | 417 | 417 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 4/12/2024 | 4/16/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 578 | 578 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 5/30/2023 | 6/5/2023 | Flowing | 0 | Down to Zero | -- | 0 | Down to Zero | 1045 | 1044 | No | None | None | |
403265402 | Form 17 | 12/19/2022 | 12/19/2022 | FLOWING | 64 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 2340 | 2338 | No | -- | -- | Post-Production within 60 days of first sales. 64 PSI water and gas flow blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. |
403263430 | Form 17 | 12/14/2022 | 12/16/2022 | FLOWING | 119 | DOWN TO 0 | GAS | 0 | NO FLOW | 2608 | 2616 | Yes | -- | -- | Post-Production within 30 days of first sales. 119 PSI gas flow blew down to 0 PSI in 2 seconds. No flow or pressure for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
403095909 | Form 17 | 7/1/2022 | 7/5/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |