Click for Specifics | Full | 10/21/2024 | 11/4/2024 | | 0 | No Flow | -- | 0 | No Flow | 662 | 662 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 12/8/2023 | 12/11/2023 | Flowing | 0 | No Flow | -- | 0 | No Flow | 860 | 861 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
403100722 | Form 17 | 7/5/2022 | 7/11/2022 | FLOWING | 1 | WHISPER | GAS | 0 | NO FLOW | 2342 | 2342 | No | -- | -- | Post Production within 60 days of first sales, 1 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
402922008 | Form 17 | 1/9/2022 | 1/10/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. Vacuum on open for 5 minutes and 16 seconds. |
402811961 | Form 17 | 9/9/2021 | 9/15/2021 | SHUT-IN | -- | NO FLOW | NONE | 0 | NO FLOW | -- | -- | No | -- | -- | Test per NTO. DUC well.
Vacuum on open for 2 minutes and 40 seconds. |