| Click for Specifics | Full | 11/7/2025 | 11/17/2025 | | 3 | Continuous | -- | 0 | No Flow | 282 | 281 | No | No | No | Annual Test. 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 10/21/2024 | 11/4/2024 | | 0 | No Flow | -- | 0 | No Flow | 334 | 333 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 12/8/2023 | 12/11/2023 | Flowing | 0 | No Flow | -- | 0 | No Flow | 429 | 430 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403100676 | Form 17 | 7/5/2022 | 7/11/2022 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 1551 | 1551 | No | -- | -- | Post Production test within 60 days of first sales, 0 PSI no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 402921974 | Form 17 | 1/9/2022 | 1/10/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. Vacuum on open. |