| Click for Specifics | Light | 5/4/2025 | 6/16/2025 | | 0 | | -- | 0 | | 570 | 570 | No | No | No | |
| Click for Specifics | Light | 7/15/2024 | 8/20/2024 | | 0 | | -- | 0 | | 407 | 407 | No | No | No | |
| Click for Specifics | Light | 5/2/2023 | 6/5/2023 | Flowing | 0 | | -- | 0 | | 521 | 521 | No | No | No | |
| Click for Specifics | Light | 5/2/2022 | 6/22/2022 | Plunger Lift | 0 | | -- | 0 | | 594 | 594 | No | No | No | |
| Click for Specifics | Full | 8/31/2021 | 9/20/2021 | | 0 | NO FLOW | -- | 0 | NO FLOW | 722 | 722 | No | NO | No |
Surface casing had no pressure or flow. |
| Click for Specifics | Full | 1/28/2020 | 2/10/2020 | | 0 | WHISPER | -- | 0 | NO FLOW | 317 | 317 | No | No | No | Surface casing, had no pressure, whispered for 2 second when opened. |
| 402047440 | Form 17 | 5/11/2019 | 5/17/2019 | FLOWING | 1 | DOWN TO 0 | -- | 0 | NO FLOW | 434 | 477 | No | -- | -- | Surface casing blew down in 10 seconds, produced only gas. |
| 401909516 | Form 17 | 1/14/2019 | 1/17/2019 | SHUT-IN | 2 | NO FLOW | -- | 0 | NO FLOW | 0 | -- | No | -- | -- | Pre-Stimulation Bradenhead test.
Well is treed up for frac. No means of gauging production casing pressure.
|