| Click for Specifics | Light | 5/4/2025 | 6/16/2025 | | 17 | | -- | 0 | | 526 | 526 | No | No | No | |
| Click for Specifics | Light | 7/15/2024 | 8/20/2024 | | 19 | | -- | 0 | | 353 | 353 | No | No | No | |
| Click for Specifics | Light | 5/2/2023 | 6/5/2023 | Flowing | 14 | | -- | 0 | | 542 | 543 | No | No | No | |
| Click for Specifics | Light | 5/2/2022 | 6/22/2022 | Plunger Lift | 9 | | -- | 0 | | 517 | 518 | No | No | No | |
| Click for Specifics | Full | 8/31/2021 | 9/20/2021 | | 3 | DOWN TO 0 | -- | 0 | NO FLOW | 723 | 723 | No | NO | No |
Surface casing pressure blew down to 0 psi in 10 seconds, produced only gas. |
| Click for Specifics | Full | 2/24/2020 | 3/23/2020 | | 10 | DOWN TO 0 | -- | 0 | NO FLOW | 273 | 273 | No | No | No | Surface casing pressure blew down to 0 psi in 5 seconds, produced only gas. |
| 402047431 | Form 17 | 5/11/2019 | 5/17/2019 | FLOWING | 15 | DOWN TO 0 | -- | 0 | NO FLOW | 548 | 548 | No | -- | -- | Surface casing blew down in 5 seconds, produced only gas. |
| 401909559 | Form 17 | 1/14/2019 | 1/17/2019 | SHUT-IN | 10 | VAPOR | -- | 0 | NO FLOW | 0 | -- | No | -- | -- | Pre-Stimulation Bradenhead test.
Well is treed up for frac. No means of gauging production casing pressure.
Surface blew down to zero in under 1 second. No flow for the rest of the test. |