| Click for Specifics | Light | 5/4/2025 | 6/16/2025 | | 15 | | -- | 0 | | 602 | 602 | No | No | No | |
| Click for Specifics | Light | 7/15/2024 | 8/20/2024 | | 15 | | -- | 0 | | 354 | 354 | No | No | No | |
| Click for Specifics | Light | 5/2/2023 | 6/5/2023 | Flowing | 16 | | -- | 0 | | 457 | 458 | No | No | No | |
| Click for Specifics | Light | 5/2/2022 | 6/22/2022 | Plunger Lift | 17 | | -- | 0 | | 546 | 548 | No | No | No | |
| Click for Specifics | Full | 8/31/2021 | 9/20/2021 | | 16 | DOWN TO 0 | -- | 0 | NO FLOW | 829 | 830 | No | NO | No |
Surface casing pressure blew down to 0 psi in 1 minute, produced only gas. |
| Click for Specifics | Full | 2/24/2020 | 3/23/2020 | | 0 | WHISPER | -- | 0 | NO FLOW | 509 | 509 | No | No | No | Surface casing, had no pressure, whispered for 3 seconds when opened. |
| 402048420 | Form 17 | 5/20/2019 | 5/20/2019 | FLOWING | 13 | DOWN TO 0 | -- | 0 | NO FLOW | 485 | 485 | No | -- | -- | First production test. Surface casing blew down in 15 seconds, produced only gas. |
| 401909573 | Form 17 | 1/14/2019 | 1/17/2019 | SHUT-IN | 37 | VAPOR | -- | 0 | NO FLOW | 0 | -- | No | -- | -- | Pre-Stimulation Bradenhead test.
Well is treed up for frac. No means of gauging production casing pressure.
Surface blew down to zero in 2 seconds. No flow for the rest of the test. |