| Click for Specifics | Light | 5/4/2025 | 6/16/2025 | | 0 | | -- | 0 | | 505 | 505 | No | No | No | |
| Click for Specifics | Light | 7/15/2024 | 8/20/2024 | | 0 | | -- | 0 | | 356 | 356 | No | No | No | |
| Click for Specifics | Light | 5/2/2023 | 6/5/2023 | Flowing | 0 | | -- | 0 | | 552 | 553 | No | No | No | |
| Click for Specifics | Light | 5/2/2022 | 6/22/2022 | Plunger Lift | 0 | | -- | 0 | | 582 | 585 | No | No | No | |
| Click for Specifics | Full | 8/31/2021 | 9/20/2021 | | 3 | DOWN TO 0 | -- | 0 | NO FLOW | 815 | 815 | No | NO | No |
Surface casing pressure blew down to 0 psi in 10 seconds, produced only gas. |
| Click for Specifics | Full | 1/28/2020 | 2/10/2020 | | 0 | WHISPER | -- | 0 | NO FLOW | 50 | 50 | No | No | No | Surface casing, had no pressure, whispered for 20 seconds when opened. |
| 402047403 | Form 17 | 5/11/2019 | 5/17/2019 | FLOWING | 1 | DOWN TO 0 | -- | 0 | NO FLOW | 93 | 82 | No | -- | -- | Surface casing blew down in 5 seconds, produced only gas. |
| 401909551 | Form 17 | 1/14/2019 | 1/17/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | -- | No | -- | -- | Pre-Stimulation Bradenhead test.
Well is treed up for frac. No means of gauging production casing pressure.
|