403764145 | Form 17 | 4/15/2024 | 4/22/2024 | SHUT-IN | 12 | DOWN TO 0 | GAS | 0 | NO FLOW | 406 | 406 | No | -- | -- | Remediation follow up test. 12 PSI gas blew down to 0 PSI within first 95 seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403377781 | Form 17 | 4/14/2023 | 4/19/2023 | PLUNGER LIFT | 236 | CONTINUOUS | GAS | 0 | WHISPER | 412 | 398 | Yes | -- | -- | Annual Test. 236 PSI gas flow blew down to 0 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
403112349 | Form 17 | 7/11/2022 | 7/21/2022 | PLUNGER LIFT | 123 | DOWN TO 0 | GAS | 0 | WHISPER | 386 | 378 | Yes | Yes | -- | test after pressure discovery. Gas on open, collected BH and prod. sample. Down to 0 in 45 seconds. Whisper for 5 minutes and died to almost undetectable vapor for remainder of test. |
402800557 | Form 17 | 8/27/2021 | 9/2/2021 | PLUNGER LIFT | 46 | DOWN TO 0 | GAS | 0 | NO FLOW | 430 | 425 | No | -- | -- | Test per NTO. Gas on open, down to whisper in 30 seconds, died in 2 minutes. No flow for remainder of test. |
Click for Specifics | Light | 10/28/2020 | 2/22/2021 | | 0 | | -- | 0 | No Flow | 351 | 361 | No | No | No | |
402527588 | Form 17 | 10/28/2020 | 11/6/2020 | FLOWING | 47 | CONTINUOUS | GAS | 0 | NO FLOW | 385 | 385 | Yes | Yes | No | Test after blow down period. Last blowdown 7/31/2020. Gas at open down to whisper at 1 minute. Vapor at 2 minutes. Dead at 9 minutes.
Returned to sample on 11/4/2020 |
402151063 | Form 17 | 8/20/2019 | 8/20/2019 | FLOWING | 525 | CONTINUOUS | -- | 0 | WHISPER | 615 | 611 | Yes | Yes | -- | Test per NTO. BH had 525 psi on open and was continuous until the 25 min mark where it was a whisper. Samples taken off of BH and CSG. Shut in pressure was 0 psi. No fluid. |