404127465 | Form 17 | 3/3/2025 | 3/13/2025 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 0 PSI, with no flow observed for 30 minutes. |
403846188 | Form 17 | 6/28/2024 | 7/5/2024 | | 55 | CONTINUOUS | WATER AND GAS | 55 | CONTINUOUS | 525 | 525 | No | -- | -- | Annual Test. 55 PSI continuous water and gas, did not blow down. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
403618469 | Form 17 | 12/6/2023 | 12/7/2023 | PLUNGER LIFT | 175 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 563 | 562 | No | -- | -- | Abatement system follow up test. 175 PSI water and gas flow blew down to 0 PSI within first 5 minutes of test. ~4 gallons of fluid at open turned to light trickle for remainder of test, ~5 gallons total. PDC will monitor pressure and re-test according to bradenhead policy. |
403444719 | Form 17 | 6/22/2023 | 6/26/2023 | PLUNGER LIFT | 113 | CONTINUOUS | WATER AND GAS | 0 | DOWN TO 0 | 645 | 642 | No | -- | -- | Abatement system follow up test. 113 PSI gas and fluid flow blew down to 0 PSI within first minute of test. Fluid trickled for 12 minutes, then dripped for remainder of test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
403150758 | Form 17 | 8/29/2022 | 8/30/2022 | FLOWING | 99 | DOWN TO 0 | GAS | 0 | NO FLOW | 948 | 948 | Yes | -- | -- | Engineering Ad Hoc test, 99 PSI gas flow blew down to 0 PSI in five minutes. No flow or pressure for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
|
403074820 | Form 17 | 6/1/2022 | 6/10/2022 | FLOWING | 72 | DOWN TO 0 | GAS | 0 | NO FLOW | 1195 | 1194 | No | -- | -- | Test after pressure discovery. Gaseous on open for 10 seconds and died. Unable to collect gas sample due to lack of volume. No flow for remainder of test. |
402833112 | Form 17 | 10/5/2021 | 10/6/2021 | FLOWING | 42 | DOWN TO 0 | GAS | 0 | NO FLOW | 2318 | 2318 | No | -- | -- | Test after DOFP. Gas on open for 2 minutes and died. No flow for remainder of test. |
402697904 | Form 17 | 5/12/2021 | 5/22/2021 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. Vacuum on open for 2 minutes. |