Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-001-09899Ivey LC
26-362HC
PDC ENERGY INC
69175
PR
9/1/2021
WATTENBERG
90750
ADAMS  001
SWSE 11 1S68W 6
442411
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 2030 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404210688Form 175/5/20255/20/2025GAS LIFT81CONTINUOUS WATER AND GAS1 WHISPER 460455No----Engineering Ad Hoc test. 81 PSI water and gas blew down to 1 PSI in thirty minutes. Water observed for entire test, ~3 gals. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly.
403846198Form 176/28/20247/5/2024 54CONTINUOUS WATER AND GAS54 CONTINUOUS 556556No----Annual Test. 54 PSI water and gas, never blew down. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
403618495Form 1712/6/202312/7/2023FLOWING148CONTINUOUS GAS AND LIQUID HYDROCARBON0 CONTINUOUS 647648No----Abatement system follow up test. 148 PSI fluid and gas flow blew down to 0 PSI within first 5 minutes of test. ~4 gallon fluid at open, steady trickle for remainder of test, ~5 gallons total. PDC will monitor pressure and re-test according to bradenhead policy.
403444726Form 176/22/20236/26/2023FLOWING63CONTINUOUS GAS AND LIQUID HYDROCARBON0 DOWN TO 0 745746No----Abatement system follow up test. 63 PSI gas and fluid flow blew down to 0 PSI within first minute of test. Light trickle of fluid for 8 minutes, then dripped for remainder of test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
403150745Form 178/29/20228/30/2022FLOWING73DOWN TO 0 GAS0 NO FLOW 11971197Yes----Engineering Ad Hoc test, 73 PSI gas flow blew down to 0 PSI in five minutes with no flow or pressure for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
403029191Form 174/20/20224/27/2022FLOWING28DOWN TO 0 GAS0 NO FLOW 16351635No----Re-test, build up since 4/7/2022. Gas at open for 6 seconds and died.
402900076Form 1712/6/202112/15/2021FLOWING50DOWN TO 0 GAS0 NO FLOW 26262625No----Test after date of first production. Gas at open for 2 seconds then dead. Unable to sample gas.
402697905Form 175/12/20215/22/2021SHUT-IN15DOWN TO 0 GAS0 NO FLOW 05No----Test prior to toe prep/frac.