| Click for Specifics | Full | 11/17/2025 | 11/24/2025 | | 0 | No Flow | -- | 0 | No Flow | 400 | 400 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404196794 | Form 17 | 4/22/2025 | 5/8/2025 | GAS LIFT | 1 | CONTINUOUS | GAS | 1 | WHISPER | 456 | 456 | No | -- | -- | Remediation follow up test. 1 PSI continuous gas flow, did not blow down. Whisper gas continued for entire test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 684 | 684 | No | No | No | |
| 403354191 | Form 17 | 3/22/2023 | 3/23/2023 | FLOWING | 19 | DOWN TO 0 | WATER AND GAS | 0 | DOWN TO 0 | 2324 | 2322 | No | -- | -- | Post-Production within 60 days of first sales. 19 PSI water and gas flow blew down to 0 PSI within first minute of test, water continued dripping for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403352239 | Form 17 | 3/17/2023 | 3/21/2023 | FLOWING | 245 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 2468 | 2467 | Yes | Yes | -- | Post-Production within 30 days of first sales. 245 PSI gas on open for ~1 second and cut to water. Produced ~3 gallons of water and died. No flow for remainder of test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403131132 | Form 17 | 8/9/2022 | 8/10/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |
| 403095605 | Form 17 | 7/1/2022 | 7/5/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |