| 404449318 | Form 17 | 11/14/2025 | 11/24/2025 | PLUNGER LIFT | 44 | SURGE | LIQUID HYDROCARBON | 0 | NO FLOW | 350 | 350 | No | -- | -- | |
| 404380456 | Form 17 | 9/18/2025 | 10/6/2025 | GAS LIFT | 102 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 377 | 381 | No | -- | -- | High Pressure Verification Test. 102 PSI water and gas blew down to 0 PSI in thirty minutes, water observed for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| 404196813 | Form 17 | 4/21/2025 | 5/8/2025 | GAS LIFT | 52 | CONTINUOUS | GAS | 1 | WHISPER | 411 | 400 | No | -- | -- | Engineering Ad Hoc test. 52 PSI whisper water blew down to 1 PSI in thirty minutes. Whisper gas observed for entire test. Operator will continue to monitor monthly. |
| 403773599 | Form 17 | 4/24/2024 | 9/17/2024 | PLUNGER LIFT | 14 | WHISPER | GAS | 0 | WHISPER | 610 | 610 | No | -- | -- | Annual test. 14 PSI whisper gas blew down to 0 PSI in 30 minutes. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403355457 | Form 17 | 3/22/2023 | 3/24/2023 | FLOWING | 3 | DOWN TO 0 | GAS | 0 | NO FLOW | 1523 | 1522 | No | -- | -- | Post-Production within 60 days of first sales. 3 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403096910 | Form 17 | 7/5/2022 | 7/6/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |