| 404553825 | Form 17 | 2/12/2026 | 2/23/2026 | SHUT-IN | 72 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | NO FLOW | 448 | 454 | No | -- | -- | |
| Click for Specifics | Full | 11/17/2025 | 11/24/2025 | | 48 | Continuous | -- | 0 | No Flow | 450 | 450 | No | No | No | Annual Test. 48 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403773565 | Form 17 | 4/24/2024 | 9/17/2024 | PLUNGER LIFT | 9 | WHISPER | GAS | 0 | WHISPER | 880 | 880 | No | -- | -- | Annual test. 9 PSI whisper gas blew down to 0 PSI in 30 minutes. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403355450 | Form 17 | 3/22/2023 | 3/24/2023 | FLOWING | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 1774 | 1776 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403096902 | Form 17 | 7/5/2022 | 7/6/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |