| 404569537 | Form 17 | 2/26/2026 | 3/6/2026 | PLUNGER LIFT | 30 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 412 | 418 | No | -- | -- | Operator will schedule a sampling event and submit results via form 43. |
| 404449303 | Form 17 | 11/14/2025 | 11/24/2025 | PLUNGER LIFT | 40 | CONTINUOUS | LIQUID HYDROCARBON | 0 | NO FLOW | 455 | 448 | No | -- | -- | |
| 404292473 | Form 17 | 7/9/2025 | 7/24/2025 | PLUNGER LIFT | 54 | CONTINUOUS | GAS | 0 | NO FLOW | 579 | 579 | No | -- | -- | Engineering Ad Hoc test. 54 PSI blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will schedule a sampling event and submit results via form 43. Operator will continue to monitor monthly. |
| Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 10 | Down to Zero | -- | 0 | Down to Zero | 676 | 677 | No | No | No | |
| 403354104 | Form 17 | 3/22/2023 | 3/23/2023 | FLOWING | 10 | DOWN TO 0 | GAS | 0 | NO FLOW | 2410 | 2410 | No | -- | -- | Post-Production within 60 days of first sales. 10 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403095591 | Form 17 | 7/1/2022 | 7/5/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy. |