| 2357663 | Form 17 | 2/18/2022 | 2/18/2022 | SHUT-IN | 0 | WHISPER | -- | 0 | NO FLOW | 190 | 190 | No | -- | -- | 2/18/2022 = Travel to location w/rig & supporting equip, spot in, rig up, check well pressures, perform bradenhead test, record data, shut well in, shut down. |
| 402433809 | Form 17 | 6/25/2020 | 6/29/2020 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 250 | 250 | No | -- | -- | |
| 1632535 | Form 17 | 1/19/2010 | | PLUNGER LIFT | 15 | DOWN TO 0 | -- | 0 | NO FLOW | 120 | 120 | No | -- | -- | Surface blew down in 10 seconds and remained static during test. Plumbed valve to top of ground. |