2357662 | Form 17 | 3/2/2022 | 3/2/2022 | SHUT-IN | 0 | WHISPER | -- | 0 | NO FLOW | 200 | 200 | No | -- | -- | 3/2/2022= Travel to location w/rig & supporting equip, spot in, rig up, check well pressures, perform bradenhead test, record data, continue w/plugging operations. |
402817533 | Form 17 | 9/20/2021 | 9/21/2021 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 80 | 80 | No | -- | -- | |
402396798 | Form 17 | 5/6/2020 | 5/13/2020 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 145 | 145 | No | -- | -- | |
1632537 | Form 17 | 1/19/2010 | | PLUNGER LIFT | 10 | DOWN TO 0 | -- | 0 | NO FLOW | 110 | 110 | No | -- | -- | Surface blew down in 5 seconds and remained static during test. Valve plumbed to top of ground. |