Skip to Main Content

COGIS

Facility Detail

COGIS WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view electronic form data from database (Internal only). COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48251
Well Classification: OW Status: PR - 12/1/2022
Well Name/No:COYOTE TRAILS #33W-15-2C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2022
FacilityID:458189LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5273 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1231FSL  2417 FELLat/Long: 40.018198 / -105.007697Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.018199 / -105.007698Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/1/2019
End Date: 9/9/2019
Reported: 9/26/2019
Days to report: 17

 Wellbore Data for Original WellboreWellbore Classification: OW       PR - 12/1/2022       Measured TD: 15847 ft.    Vertical TD: 8160 ft.
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/17/2020
Proposed Top PZ Location:Sec:33 Twp: 1N 68W Footage: 439 FNL  2373 FWL
Bottom Hole Location:Sec:32 Twp: 1N 68W Footage: 467 FNL  505 FWL
Prop Depth/Form:15652 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NFCC , Formation: NIOBRARA-FORT HAYS-CODELL-CARLILE , Order: 407-3177 , Unit Acreage: 700, Drill Unit: Section 32-1N-68W: N
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15930 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2103, Top: , Bottom: 15930 ft.

Wellbore Completed
Completion Date:4/18/2019
Spud Date:3/27/2019Spud Date Is:ACTUAL
Measured TD:15847 ft.Measured PB depth:15822 ft.
True Vertical TD:8160 ft.True Vertical PB depth:8161 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 439 FNL  2373 FWL
Bottom Hole Location:Sec:32 Twp: 1N 68WFootage: 467 FNL  505 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1595 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1595 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15836 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2575, Top: 150 ft., Bottom: 15847 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4646 ft.NN
SUSSEX5021 ft.NN
SHANNON5666 ft.NN
SHARON SPRINGS7897 ft.NN
NIOBRARA7974 ft.NN
FORT HAYS8683 ft.NN
CODELL8784 ft.NN
CARLILE12253 ft.NN
 Completed Information for Formation CARLILE        Formation Classification:  OW        Status: CM - 11/13/2019
1st Production Date: 10/4/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/9/2019
Treatment Summary:Perforated Intervals: 12274'-13758'; 15573'-15649'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:12274 ft.# Of Holes:186
Interval Bottom:15649 ft.Hole Size:0.4 in.
 Completed Information for Formation CODELL        Formation Classification:  OW        Status: CM - 11/13/2019
1st Production Date: 10/4/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/9/2019
Treatment Summary:Perforated Intervals: 8801'-11102'; 11162'-11309'; 13782'-14192'; 14251'-14326'; 14635'-15549'; 15673'-15698'; 15819'-15822'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8801 ft.# Of Holes:469
Interval Bottom:15822 ft.Hole Size:0.4 in.
 Completed Information for Formation FORT HAYS        Formation Classification:  OW        Status: CM - 11/13/2019
1st Production Date: 10/4/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/9/2019
Treatment Summary:Perforated Intervals: 8691'-8767'; 11142'-11143'; 11336'-12090'; 14215'-14216'; 14350'-14476'; 15722'-15773'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8691 ft.# Of Holes:135
Interval Bottom:15773 ft.Hole Size:0.4 in.
 Completed Information for Formation NIOBRARA        Formation Classification:  OW        Status: CM - 11/13/2019
1st Production Date: 10/4/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/9/2019
Treatment Summary:Perforated Intervals: 8023'-8667'; 12108'-12250'; 14510'-14611'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8023 ft.# Of Holes:111
Interval Bottom:14611 ft.Hole Size:0.4 in.
 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE        Formation Classification:  OW        Status: PR - 12/1/2022
1st Production Date: 10/4/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/9/2019
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell-Carlile with 31-stage plug-and-perf; 106558 total bbls fluid pumped: 99151 bbls gelled fluid and 7407 bbls fresh water; 5812490 total lbs proppant pumped: all 30/50 sand.
Total fluid used in treatment (bbls):106558Max pressure during treatment (psi):8447
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:31
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8873
Fresh water used in treatment (bbls):7407Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5812490Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7993 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/14/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 194
BBLS_OIL 357
BTU_GAS 1300
CALC_BBLS_H2O 194
CALC_BBLS_OIL 357
CALC_GOR 6479
CALC_MCF_GAS 2313
CASING_PRESS 2753
GRAVITY_OIL 49
MCF_GAS 2313
TUBING_PRESS 2065
Perforation Data:
Interval Top:8023 ft.# Of Holes:901
Interval Bottom:15822 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)8899
Total Gas Produced (MCF)90812
GOR10204
GOR DeterminationBOE
Average BOE per Day67.256
Average MCFE per Day390.090

 Federal Financial Assurance  i 

 Tribal Well  i No