Skip to Main Content

COGIS

Facility Detail

COGIS WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view electronic form data from database (Internal only). COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22988
Well Classification: GW Status: PA - 8/27/2015
Well Name/No:WOOLLEY #12-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/27/2015
FacilityID:277773LocationID:305447
County:WELD #123Location:SWNW 7 1N68W 6
Field:WATTENBERG - #90750Elevation:5095 ft.
Planned Location:2117FNL  457 FWLLat/Long: 40.067247 / -105.053808Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.067215 / -105.053741Lat/Long Source: Field Measured

 Wellbore Data for Original WellboreWellbore Classification: GW       PA - 8/27/2015       Measured TD: 8325 ft.
Wellbore Permit
Permit #:20051533 Expiration Date:5/19/2006
Prop Depth/Form:8307 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5400 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 300, Top: 4100 ft., Bottom: 5400 ft.

Wellbore Completed
Completion Date:10/4/2005
Spud Date:5/28/2005Spud Date Is:ACTUAL
Measured TD:8325 ft.Measured PB depth:8304 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, DUAL INDUCTION, COMPENSATED NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 815 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 815 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8321 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 7885 ft., Bottom: 8321 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5102 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 3880 ft., Bottom: 5102 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4440 ft.NN
SHANNON5007 ft.NN
NIOBRARA7373 ft.NN
FORT HAYS7713 ft.NN
CODELL7736 ft.NN
MOWRY8150 ft.NN
J SAND8164 ft.NN
 Completed Information for Formation J SAND        Formation Classification:  GW        Status: AB - 8/27/2015
1st Production Date: N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2005Treatment End Date:N/A
Treatment Summary:FRAC'D THE JSND (8165-8171' AND 8180-8198') WITH 187,770 GAL FRAC FLUID AND 300,460# SAND, 6/16/05
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8165 ft.# Of Holes:48
Interval Bottom:8198 ft.Hole Size:0.38 in.
 Completed Information for Formation J-NIOBRARA-CODELL        Formation Classification:  GW        Status: CM - 10/7/2005
1st Production Date: N/AChoke Size:0.250 in.
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2005Treatment End Date:N/A
Treatment Summary:DRILLED UP CBP @ 7620'. DRILLED UP CBP @ 7900' TO COMMINGLE, 10/4/05
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8154 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/7/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 128
BBLS_OIL 56
CALC_BBLS_H2O 128
CALC_BBLS_OIL 56
CALC_GOR 5196
CALC_MCF_GAS 291
CASING_PRESS 1141
MCF_GAS 291
TUBING_PRESS 498
Perforation Data:
Interval Top:7490 ft.# Of Holes:240
Interval Bottom:8198 ft.Hole Size:0.38 in.
 Completed Information for Formation NIOBRARA-CODELL        Formation Classification:  GW        Status: AB - 8/27/2015
1st Production Date: 8/16/2005Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/4/2005Treatment End Date:N/A
Treatment Summary:SET CBP @ 7900', 7/24/05. FRAC'D CODL (7736-7754') W/ 130,400 GAL FRAC FLUID, 288,340# 20/40, 8/31/05
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Initial Test Data:
Test Date:10/7/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 128
BBLS_OIL 56
CALC_BBLS_H2O 128
CALC_BBLS_OIL 56
CALC_GOR 5196
CALC_MCF_GAS 291
CASING_PRESS 1141
MCF_GAS 291
TUBING_PRESS 498
Perforation Data:
Interval Top:7490 ft.# Of Holes:192
Interval Bottom:7754 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/27/2015
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2024 - December 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No