| Off-Location Flowlines |
| Facility ID: 473935 | Operator Name: WIEPKING-FULLERTON ENERGY LLC | Status: AC |
| Operator Flowline ID: Dry Gas Line | Start Location ID: 418250 | Location: NWNW 2910S 55W |
| Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Other | Construction Date: 3/15/2011 |
| |
| Facility ID: 465630 | Operator Name: WIEPKING-FULLERTON ENERGY LLC | Status: AC |
| Operator Flowline ID: Mahalo 2 Flowline | Start Location ID: 420576 | Location: NWNW 2910S 55W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Fiberglass | Construction Date: 8/1/2011 |
| |
| Facility ID: 465632 | Operator Name: WIEPKING-FULLERTON ENERGY LLC | Status: CL |
| Operator Flowline ID: Mahalo 7 Fuel Gas Line | Start Location ID: 427915 | Location: NWNW 2910S 55W |
| Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Other | Construction Date: 7/28/2012 |
| |
| Facility ID: 473938 | Operator Name: WIEPKING-FULLERTON ENERGY LLC | Status: AC |
| Operator Flowline ID: Wet Gas Line | Start Location ID: 418250 | Location: NWNW 2910S 55W |
| Flowline Type: Peripheral Piping | Fluid Type: Other | Pipe Material: Fiberglass | Construction Date: 4/1/2011 |
| |
| Facility ID: 465633 | Operator Name: WIEPKING-FULLERTON ENERGY LLC | Status: AC |
| Operator Flowline ID: Mahalo 3 Flowline | Start Location ID: 423645 | Location: NWNW 2910S 55W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Fiberglass | Construction Date: 10/15/2012 |
| |
| Facility ID: 465631 | Operator Name: WIEPKING-FULLERTON ENERGY LLC | Status: CL |
| Operator Flowline ID: Mahalo 7 Flowline | Start Location ID: 427915 | Location: NWNW 2910S 55W |
| Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Fiberglass | Construction Date: 7/28/2012 |
| |