|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 6/1/2015 Measured TD: Vertical TD: 1785 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 6/1/2015 | | Wellbore Permit | | | Permit #: | 19970977 | Expiration Date: | 12/22/1998 | | Proposed Depth/Form: | 1800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 300-1 , Unit Acreage: 640, Drill Unit: ALL |
| | |
| Wellbore Completed | | Completion Date: | 6/19/1998 | | Spud Date: | 6/17/1998 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | 1785 ft. | True Vertical PB depth: | 1716 ft. | | Log Types: | PHASOR INDUCTION & COMP NEUTRON LITHO DENSITY | | Casing: | String Type: SURF, Hole Size: 9.875 in., Size: 7 in., Top: , Depth: 208 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 185, Top: 0 ft., Bottom: 208 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 6.25 in., Size: 4.5 in., Top: , Depth: 1760 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 820 ft., Bottom: 1760 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 1551 ft. | | N | N |
Formation NBRR Formation Classification: GW Status: PR - 6/1/2015 Interval Top: 1556 ft. Interval Bottom: 1574 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/28/1998 | Choke Size: | 0.343 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/19/1998 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00330213 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/28/1998 | Test Method: | MULTI BACK PRES | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 526 | | CASING_PRESS | 186 | | MCF_GAS | 964.97 |
| | Perforation Data: | | Interval Top: | 1556 ft. | # Of Holes: | 36 | | Interval Bottom: | 1574 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 5115 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 2.416 |
| Average MCFE per Day | 14.013 |
| Federal Financial Assurance | i | Y |
|
|