Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-52069
Well Classification: OW Status: PR - 7/29/2025
Well Name/No:Bishop #A05-764
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/29/2025
FacilityID:483999LocationID:483510
County:WELD #123Location:NENE 7 6N64W 6
Field:WATTENBERG - #90750Elevation:4745 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1011FNL  396 FELLat/Long: 40.504968 / -104.585101Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/23/2025
End Date: 4/6/2025
Reported: 5/23/2025
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification:              Status: PR - 7/29/2025             Measured TD:

 Wellbore Data for Original WellboreWellbore Classification:         PR - 7/29/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/24/2030
Proposed Top PZ Location:Sec:5 Twp: 6N 64W Footage: 200 FSL  1716 FWL
Bottom Hole Location:Sec:32 Twp: 7N 64W Footage: 200 FNL  1604 FWL
Proposed Depth/Form:17953 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-3384 , Unit Acreage: 1865, Drill Unit: Township 6 North, Ra
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1950 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 640, Top: 0 ft., Bottom: 1950 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17823 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2097, Top: , Bottom: 17823 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:2/9/2024Spud Date Is:NOTICE
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:5 Twp: 6N 64WFootage: 748 FSL  1699 FWL

Formation NBRR                     Formation Classification:  OW                     Status:  WO - 4/1/2026                  Interval Top: 8204 ft.    Interval Bottom: 17795 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/27/2025Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:3/23/2025Treatment End Date:4/6/2025
Treatment Summary:Niobrara completed with 607 bbls 28% HCL, 357,504 bbls slurry, 17,229,111 lb 40/140.
Total fluid used in treatment (bbls):358111Max pressure during treatment (psi):8400
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):607Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):357504Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17229111Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7246 ft.
Tubing Packer Depth:7229 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/29/2025Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 718
BBLS_OIL 164
BTU_GAS 1359
CALC_BBLS_H2O 718
CALC_BBLS_OIL 164
CALC_GOR 909
CALC_MCF_GAS 149
CASING_PRESS 1123
GRAVITY_OIL 42
MCF_GAS 149
TUBING_PRESS 1388
Perforation Data:
Interval Top:8204 ft.# Of Holes:1280
Interval Bottom:17795 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
March 2025 - February 2026i
Total Oil Produced (Barrels)94796
Total Gas Produced (MCF)292146
GOR3081
GOR DeterminationBOE
Average BOE per Day398.650
Average MCFE per Day2312.184

 Federal Financial Assurance  i 

 Tribal Well  i No