Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51941
Well Classification: OW Status: PR - 11/21/2023
Well Name/No:Cosslett East #1G-22H-H168
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/21/2023
FacilityID:483569LocationID:323151
County:WELD #123Location:SENE 22 1N68W 6
Field:WATTENBERG - #90750Elevation:5182 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1715FNL  1148 FELLat/Long: 40.039231 / -104.984151Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.039228 / -104.984153Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/11/2023
End Date: 8/23/2023
Reported: 9/21/2023
Days to report: 29
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 11/21/2023             Measured TD: 18867 ft.    Vertical TD: 7766 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 11/21/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/25/2025
Proposed Top PZ Location:Sec:23 Twp: 1N 68W Footage: 460 FNL  2380 FWL
Bottom Hole Location:Sec:26 Twp: 1N 68W Footage: 460 FSL  2380 FWL
Proposed Depth/Form:18942 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2533 , Unit Acreage: 1920, Drill Unit: T1N R68W Sec. 22: E/
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 550 ft., Weight: 54.4 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 550 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 833, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18942 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2954, Top: , Bottom: 18942 ft.
Casing:String Type: NEW, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.

Wellbore Completed
Completion Date:5/5/2023
Spud Date:3/16/2023Spud Date Is:ACTUAL
Measured TD:18867 ft.Measured PB depth:18859 ft.
True Vertical TD:7766 ft.True Vertical PB depth:7766 ft.
Top PZ Location:Sec:23 Twp: 1N 68WFootage: 470 FNL  2403 FWL
Bottom Hole Location:Sec:26 Twp: 1N 68WFootage: 461 FSL  2382 FWL
Log Types:CBL, MWD/LWD, (Resistivity on 123-51944).
Casing:String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 603 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 920, Top: 0 ft., Bottom: 603 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2599 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 0 ft., Bottom: 2599 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18863 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2995, Top: 110 ft., Bottom: 18863 ft., Determination Method: CBL
Casing:String Type: NEW, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 145 ft., Weight: 52.78 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 145 ft., Determination Method: VISU
FormationInterval TopLog BottomCoredDSTs
PARKMAN5364 ft.NN
SUSSEX6045 ft.NN
SHANNON6546 ft.NN
SHARON SPRINGS8648 ft.NN
NIOBRARA8701 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 11/21/2023                Interval Top: 9155 ft.    Interval Bottom: 18798 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/10/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/11/2023Treatment End Date:8/23/2023
Treatment Summary:Frac'd Niobrara with 56 stage plug and perf; 7280110 total lbs proppant pumped: 1606412 lbs 40/70 mesh and 5673698 lbs 100 mesh; 316651 total bbls fluid pumped: 293569 bbls gelled fluid, 179 bbls recycled water, 22226 bbls fresh water and 677 bbls 15% HCl acid.
Total fluid used in treatment (bbls):316651Max pressure during treatment (psi):9903
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:56
Total acid used in treatment (bbls):677Min frac gradient (psi/ft):0.80
Recycled water used in treatment (bbls):179Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):22226Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7280110Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8898 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2023Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 358
BBLS_OIL 584
BTU_GAS 1300
CALC_BBLS_H2O 358
CALC_BBLS_OIL 584
CALC_GOR 2334
CALC_MCF_GAS 1363
CASING_PRESS 2418
GRAVITY_OIL 38
MCF_GAS 1363
TUBING_PRESS 1524
Perforation Data:
Interval Top:9155 ft.# Of Holes:3246
Interval Bottom:18798 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)17775
Total Gas Produced (MCF)315462
GOR17747
GOR DeterminationMCFE
Average BOE per Day198.061
Average MCFE per Day1148.730

 Federal Financial Assurance  i 

 Tribal Well  i No