|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/22/2024 Measured TD: 18037 ft. Vertical TD: 7094 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/22/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/6/2025 | | Proposed Top PZ Location: | Sec:33 Twp: 4N 67W | Footage: 2350 FSL 706 FWL | | Bottom Hole Location: | Sec:34 Twp: 4N 67W | Footage: 2341 FSL 205 FEL | | Proposed Depth/Form: | 17998 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-3374 , Unit Acreage: 3440, Drill Unit: T3N67W;1:NW4;2:N2;3: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17988 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2022, Top: 1000 ft., Bottom: 17988 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/4/2024 | | Spud Date: | 4/6/2024 | Spud Date Is: | ACTUAL | | Measured TD: | 18037 ft. | Measured PB depth: | 17981 ft. | | True Vertical TD: | 7094 ft. | True Vertical PB depth: | 7093 ft. | | Top PZ Location: | Sec:33 Twp: 4N 67W | Footage: 2324 FSL 656 FWL | | Bottom Hole Location: | Sec:34 Twp: 4N 67W | Footage: 2357 FSL 207 FEL | | Log Types: | CBL, MWD/LWD, a CNL logs run on CAMENISCH 33-2HZ, API# 123-51901
| | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1884 ft., Weight: 28 , Citings Type: ACTUAL | | Cement: | Sacks: 635, Top: 0 ft., Bottom: 1884 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18026 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1630, Top: 1840 ft., Bottom: 18037 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3982 ft. | | | | | SUSSEX | 4594 ft. | | | | | SHANNON | 5222 ft. | | | | | SHARON SPRINGS | 7910 ft. | | | | | NIOBRARA | 7932 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 11/22/2024 Interval Top: 8428 ft. Interval Bottom: 17846 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/24/2024 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 8/26/2024 | Treatment End Date: | 9/7/2024 | | Treatment Summary: | 24 BBL 15% HCL ACID; 331 Y007-FB ACID; 97 BBL 7.5% HCL ACID; 14,453 BBL PUMP DOWN; 422,719 BBL SLICKWATER; 437,624 BBL TOTAL FLUID; 1,032,240 LBS 100 MESH GENOA/SAND HILLS; 12,909,810 LBS 40/140 CAPITAL SAND; 13,942,050 LBS TOTAL PROPPANT. | | Total fluid used in treatment (bbls): | 437624 | Max pressure during treatment (psi): | 8291 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 28 | | Total acid used in treatment (bbls): | 452 | Min frac gradient (psi/ft): | 0.97 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 4663 | | Fresh water used in treatment (bbls): | 410115 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 13942050 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7942 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/30/2024 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 672 | | BBLS_OIL | 1827 | | BTU_GAS | 1343 | | CALC_BBLS_H2O | 672 | | CALC_BBLS_OIL | 1827 | | CALC_GOR | 2231 | | CALC_MCF_GAS | 4076 | | CASING_PRESS | 2487 | | GRAVITY_OIL | 53 | | MCF_GAS | 4076 | | TUBING_PRESS | 1550 |
| | Perforation Data: | | Interval Top: | 8428 ft. | # Of Holes: | 840 | | Interval Bottom: | 17846 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 133202 |
| Total Gas Produced (MCF) | 875982 |
| GOR | 6576 |
| GOR Determination | BOE |
| Average BOE per Day | 778.792 |
| Average MCFE per Day | 4516.983 |
| Federal Financial Assurance | i | |
|
|