|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/15/2023 Measured TD: 22507 ft. Vertical TD: 7258 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/15/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/6/2025 | Proposed Top PZ Location: | Sec:9 Twp: 3N 67W | Footage: 2068 FNL 366 FWL | Bottom Hole Location: | Sec:11 Twp: 3N 67W | Footage: 2480 FNL 362 FEL | Proposed Depth/Form: | 22553 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-3375 , Unit Acreage: 1600, Drill Unit: T3N-R67W;09:N2,N2S2; | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 22543 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 2579, Top: , Bottom: 22543 ft. |
| | |
Wellbore Completed | Completion Date: | 2/24/2023 | Spud Date: | 11/18/2022 | Spud Date Is: | ACTUAL | Measured TD: | 22507 ft. | Measured PB depth: | 22444 ft. | True Vertical TD: | 7258 ft. | True Vertical PB depth: | 7256 ft. | Top PZ Location: | Sec:9 Twp: 3N 67W | Footage: 2077 FNL 285 FWL | Bottom Hole Location: | Sec:11 Twp: 3N 67W | Footage: 2502 N 336 E | Log Types: | CBL, MWD/LWD, CNL has been run on the Berry Farms 8-2HZ API 05-123-51858
| Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 27 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1843 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 797, Top: 0 ft., Bottom: 1843 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 22491 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 2445, Top: 1385 ft., Bottom: 22507 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3585 ft. | | | | SUSSEX | 4047 ft. | | | | SHANNON | 4561 ft. | | | | SHARON SPRINGS | 6876 ft. | | | | NIOBRARA | 6931 ft. | | | | CODELL | 7568 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 12/14/2023 Interval Top: 11143 ft. Interval Bottom: 11494 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 11143 ft. | # Of Holes: | 24 | Interval Bottom: | 11494 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 12/14/2023 Interval Top: 7543 ft. Interval Bottom: 22294 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 4/29/2023 | Treatment End Date: | 5/20/2023 | Treatment Summary: | Codell - 7,543-11,094 and 11,543-22,294 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7543 ft. | # Of Holes: | 864 | Interval Bottom: | 22294 ft. | Hole Size: | 0.44 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 8/15/2023 Interval Top: 754 ft. Interval Bottom: 22294 ft. Completed Information for Formation CODELL-FORT HAYS | 1st Production Date: | 8/20/2023 | Choke Size: | | Formation Name: | CODELL-FORT HAYS | Commingled: | | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 4/29/2023 | Treatment End Date: | 5/20/2023 | Treatment Summary: | Codell - 7,543-11,094, Fort Hays - 11,143-11,494, Codell - 11,543-22,294
1,9751 BBL PUMP DOWN; 498,292 BBL SLICKWATER; 518,043 BBL TOTAL FLUID; 14,351,930 LBS WHITE 30/50 OTTAWA/ST. PETERS; 1,770,760 LBS WHITE 40/70 OTTAWA/ST. PETERS; 16,122,690 LBS TOTAL PROPPANT. | Total fluid used in treatment (bbls): | 518043 | Max pressure during treatment (psi): | 8274 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 37 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.87 | Recycled water used in treatment (bbls): | 6910 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 511133 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 16122690 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.428571 in. | Tubing Setting Depth: | 7132 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/3/2023 | Test Method: | Flowing | Hours Tested: | 27 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 176 | BBLS_OIL | 673 | BTU_GAS | 1322 | CALC_BBLS_H2O | 176 | CALC_BBLS_OIL | 673 | CALC_GOR | 2150 | CALC_MCF_GAS | 1447 | CASING_PRESS | 1300 | GRAVITY_OIL | 55 | MCF_GAS | 1447 | TUBING_PRESS | 1000 |
| Perforation Data: | Interval Top: | 754 ft. | # Of Holes: | 888 | Interval Bottom: | 22294 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 61409 |
Total Gas Produced (MCF) | 486808 |
GOR | 7927 |
GOR Determination | BOE |
Average BOE per Day | 396.562 |
Average MCFE per Day | 2300.049 |
Federal Financial Assurance | i | |
|
|