Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51754
Well Classification: OW Status: PR - 5/29/2023
Well Name/No:Ruby West #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PRAIRIE OPERATING CO LLC - 10819
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/29/2023
FacilityID:482572LocationID:482392
County:WELD #123Location:NESW 7 7N65W 6
Field:WATTENBERG - #90750Elevation:4924 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2587FSL  2427 FWLLat/Long: 40.589653 / -104.707111Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.589653 / -104.707111Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/7/2022
End Date: 1/1/2023
Reported: 4/17/2023
Days to report: 106
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/29/2023             Measured TD: 18549 ft.    Vertical TD: 7446 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/29/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/7/2025
Proposed Top PZ Location:Sec:12 Twp: 7N 66W Footage: 100 FNL  470 FEL
Bottom Hole Location:Sec:11 Twp: 7N 66W Footage: 100 FNL  470 FWL
Proposed Depth/Form:18650 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3330 , Unit Acreage: 640, Drill Unit: 7N-66W 1: S2S2; 2: S
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18650 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2585, Top: 2500 ft., Bottom: 18650 ft.

Wellbore Completed
Completion Date:11/6/2022
Spud Date:8/5/2022Spud Date Is:ACTUAL
Measured TD:18549 ft.Measured PB depth:18540 ft.
True Vertical TD:7446 ft.True Vertical PB depth:7446 ft.
Top PZ Location:Sec:12 Twp: 7N 65WFootage: 108 FNL  512 FEL
Bottom Hole Location:Sec:11 Twp: 7N 65WFootage: 90 FNL  469 FWL
Log Types:MWD/LWD, CBL, MUD, DIL in API 05-123-51747
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1550 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1550 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18540 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2790, Top: 440 ft., Bottom: 18540 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4328 ft.NN
SUSSEX4983 ft.NN
SHANNON5834 ft.NN
SHARON SPRINGS8070 ft.NN
NIOBRARA8088 ft.NN
FORT HAYS8508 ft.NN
CODELL8637 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  PR - 5/29/2023                 Interval Top: 8825 ft.    Interval Bottom: 18242 ft.

 Completed Information for Formation CODELL
1st Production Date:5/29/2023Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/7/2022Treatment End Date:1/1/2023
Treatment Summary:376080 bbls total slickwater; 11639465 # sand total( 200/mesh 825775 100/mesh 438890 40/70 10374800 30/50); 4493 gals 15% HCL. Method used to determine flowback volume: individual separator meters.
Total fluid used in treatment (bbls):376081Max pressure during treatment (psi):9190
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):107Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1836
Fresh water used in treatment (bbls):375974Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11639465Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7287 ft.
Tubing Packer Depth:7287 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/29/2023Test Method:Flowing
Hours Tested:23Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1164
BBLS_OIL 56
BTU_GAS 1384
CALC_BBLS_H2O 1164
CALC_BBLS_OIL 56
CALC_GOR 821
CALC_MCF_GAS 46
GRAVITY_OIL 42
MCF_GAS 46
TUBING_PRESS 1759
Perforation Data:
Interval Top:8825 ft.# Of Holes:1242
Interval Bottom:18242 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)20074
Total Gas Produced (MCF)86464
GOR4307
GOR DeterminationBOE
Average BOE per Day96.171
Average MCFE per Day557.782

 Federal Financial Assurance  i 

 Tribal Well  i No