Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-51751
Well Classification: OW Status: PR - 5/31/2023
Well Name/No:Ruby West #10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PRAIRIE OPERATING CO LLC - 10819
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/31/2023
FacilityID:482564LocationID:482392
County:WELD #123Location:NESW 7 7N65W 6
Field:WATTENBERG - #90750Elevation:4922 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2452FSL  2426 FWLLat/Long: 40.589283 / -104.707116Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.589283 / -104.707116Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/3/2023
End Date: 1/23/2023
Reported: 4/17/2023
Days to report: 84
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/31/2023             Measured TD: 18094 ft.    Vertical TD: 7419 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/31/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/7/2025
Proposed Top PZ Location:Sec:12 Twp: 7N 66W Footage: 1251 FSL  470 FEL
Bottom Hole Location:Sec:11 Twp: 7N 66W Footage: 1251 FSL  470 FWL
Proposed Depth/Form:18125 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3330 , Unit Acreage: 1280, Drill Unit: All: 12, 11
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18125 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2497, Top: 2500 ft., Bottom: 18125 ft.

Wellbore Completed
Completion Date:9/2/2022
Spud Date:8/12/2022Spud Date Is:ACTUAL
Measured TD:18094 ft.Measured PB depth:18079 ft.
True Vertical TD:7419 ft.True Vertical PB depth:7419 ft.
Top PZ Location:Sec:12 Twp: 7N 65WFootage: 1248 FSL  666 FEL
Bottom Hole Location:Sec:11 Twp: 7N 65WFootage: 1231 FSL  484 FWL
Log Types:MWD/LWD, CBL, MUD, DIL in API 05-123-51747
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1563 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1563 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18079 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2730, Top: 100 ft., Bottom: 18079 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4197 ft.NN
SUSSEX4775 ft.NN
SHANNON5593 ft.NN
SHARON SPRINGS7687 ft.NN
NIOBRARA7703 ft.NN
FORT HAYS8097 ft.NN
CODELL8212 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  PR - 5/31/2023                 Interval Top: 8551 ft.    Interval Bottom: 17968 ft.

 Completed Information for Formation CODELL
1st Production Date:5/31/2023Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/3/2023Treatment End Date:1/23/2023
Treatment Summary:536723 bbls total slickwater; 17141310 # sand total( 200/mesh 1958545 100/mesh 40/70 15182765 30/50); 999 gals 15% HCL. Method used to determine flowback volume: individual separator meters.
Total fluid used in treatment (bbls):536723Max pressure during treatment (psi):9144
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:24
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):1.00
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1088
Fresh water used in treatment (bbls):536700Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17141310Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8036 ft.
Tubing Packer Depth:8036 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2023Test Method:Flowing
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1088
BBLS_OIL 140
BTU_GAS 1384
CALC_BBLS_H2O 1088
CALC_BBLS_OIL 140
CALC_GOR 129
CALC_MCF_GAS 18
GRAVITY_OIL 42
MCF_GAS 18
TUBING_PRESS 2215
Perforation Data:
Interval Top:8551 ft.# Of Holes:1242
Interval Bottom:17968 ft.Hole Size:0.433 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)24444
Total Gas Produced (MCF)101070
GOR4134
GOR DeterminationBOE
Average BOE per Day111.846
Average MCFE per Day648.696

 Federal Financial Assurance  i 

 Tribal Well  i No