|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/31/2023 Measured TD: 18094 ft. Vertical TD: 7419 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/31/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/7/2025 | | Proposed Top PZ Location: | Sec:12 Twp: 7N 66W | Footage: 1251 FSL 470 FEL | | Bottom Hole Location: | Sec:11 Twp: 7N 66W | Footage: 1251 FSL 470 FWL | | Proposed Depth/Form: | 18125 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-3330 , Unit Acreage: 1280, Drill Unit: All: 12, 11 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18125 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2497, Top: 2500 ft., Bottom: 18125 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/2/2022 | | Spud Date: | 8/12/2022 | Spud Date Is: | ACTUAL | | Measured TD: | 18094 ft. | Measured PB depth: | 18079 ft. | | True Vertical TD: | 7419 ft. | True Vertical PB depth: | 7419 ft. | | Top PZ Location: | Sec:12 Twp: 7N 65W | Footage: 1248 FSL 666 FEL | | Bottom Hole Location: | Sec:11 Twp: 7N 65W | Footage: 1231 FSL 484 FWL | | Log Types: | MWD/LWD, CBL, MUD, DIL in API 05-123-51747
| | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1563 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1563 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18079 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2730, Top: 100 ft., Bottom: 18079 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4197 ft. | | N | N | | SUSSEX | 4775 ft. | | N | N | | SHANNON | 5593 ft. | | N | N | | SHARON SPRINGS | 7687 ft. | | N | N | | NIOBRARA | 7703 ft. | | N | N | | FORT HAYS | 8097 ft. | | N | N | | CODELL | 8212 ft. | | N | N |
Formation CODL Formation Classification: OW Status: PR - 5/31/2023 Interval Top: 8551 ft. Interval Bottom: 17968 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/31/2023 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 1/3/2023 | Treatment End Date: | 1/23/2023 | | Treatment Summary: | 536723 bbls total slickwater; 17141310 # sand total( 200/mesh 1958545 100/mesh 40/70 15182765 30/50); 999 gals 15% HCL. Method used to determine flowback volume: individual separator meters.
| | Total fluid used in treatment (bbls): | 536723 | Max pressure during treatment (psi): | 9144 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 24 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 1.00 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 1088 | | Fresh water used in treatment (bbls): | 536700 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 17141310 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8036 ft. | | Tubing Packer Depth: | 8036 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/31/2023 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1088 | | BBLS_OIL | 140 | | BTU_GAS | 1384 | | CALC_BBLS_H2O | 1088 | | CALC_BBLS_OIL | 140 | | CALC_GOR | 129 | | CALC_MCF_GAS | 18 | | GRAVITY_OIL | 42 | | MCF_GAS | 18 | | TUBING_PRESS | 2215 |
| | Perforation Data: | | Interval Top: | 8551 ft. | # Of Holes: | 1242 | | Interval Bottom: | 17968 ft. | Hole Size: | 0.433 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 24444 |
| Total Gas Produced (MCF) | 101070 |
| GOR | 4134 |
| GOR Determination | BOE |
| Average BOE per Day | 111.846 |
| Average MCFE per Day | 648.696 |
| Federal Financial Assurance | i | |
|
|