|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/21/2022 Measured TD: 21473 ft. Vertical TD: 6508 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/21/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/16/2024 | | Proposed Top PZ Location: | Sec:13 Twp: 4N 68W | Footage: 362 FNL 2305 FEL | | Bottom Hole Location: | Sec:15 Twp: 4N 68W | Footage: 359 FNL 185 FWL | | Proposed Depth/Form: | 21470 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-3230 , Unit Acreage: 1640, Drill Unit: 4N68W: SEC 13 NW, W2 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 40 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1523 ft. | | Casing: | String Type: 1ST, Hole Size: 7.625 in., Size: 5.5 in., Top: 0 ft., Depth: 21460 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2447, Top: , Bottom: 21460 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/14/2021 | | Spud Date: | 10/1/2021 | Spud Date Is: | ACTUAL | | Measured TD: | 21473 ft. | Measured PB depth: | 21384 ft. | | True Vertical TD: | 6508 ft. | True Vertical PB depth: | 6505 ft. | | Top PZ Location: | Sec:13 Twp: 4N 68W | Footage: 358 FNL 2252 FEL | | Bottom Hole Location: | Sec:15 Twp: 4N 68W | Footage: 374 FNL 180 FWL | | Log Types: | CBL, LWD/MWD, Rule 317.p Exception, Cased Hole Neutron Logs API# 05-123- 51603
| | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 37 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1873 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 786, Top: 0 ft., Bottom: 1873 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 21463 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 2288, Top: 1070 ft., Bottom: 21473 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3736 ft. | | | | | SHARON SPRINGS | 7702 ft. | | | | | NIOBRARA | 7784 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 7/21/2022 Interval Top: 8008 ft. Interval Bottom: 13323 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/6/2022 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 3/1/2022 | Treatment End Date: | 3/26/2022 | | Treatment Summary: | 71 BBL 15% HCL ACID; 838 BBL 20% HCR-7000 WL ACID; 24 BBL 33% HCR-7000 WL ACID; 705 BBL 7.5% HCL ACID; 36,237 BBL PUMP DOWN; 523,703 BBL SLICKWATER; 561,578 BBL TOTAL FLUID; 16,127,100 LBS WHITE 40/70 OTTAWA/ST. PETERS; 16,127,100 LBS TOTAL PROPPANT. | | Total fluid used in treatment (bbls): | 561578 | Max pressure during treatment (psi): | 7951 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 49 | | Total acid used in treatment (bbls): | 1638 | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | 4830 | Total flowback volume recovered (bbls): | 12171 | | Fresh water used in treatment (bbls): | 555110 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 16127100 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7545 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/15/2022 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 352 | | BTU_GAS | 1314 | | CALC_BBLS_H2O | 27 | | CALC_BBLS_OIL | 352 | | CALC_GOR | 920 | | CALC_MCF_GAS | 324 | | CASING_PRESS | 2000 | | GRAVITY_OIL | 49 | | MCF_GAS | 324 | | TUBING_PRESS | 1450 |
| | Perforation Data: | | Interval Top: | 8008 ft. | # Of Holes: | 1479 | | Interval Bottom: | 13323 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 20628 |
| Total Gas Produced (MCF) | 131296 |
| GOR | 6364 |
| GOR Determination | BOE |
| Average BOE per Day | 118.184 |
| Average MCFE per Day | 685.452 |
| Federal Financial Assurance | i | |
|
|