|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 4/1/2024 Measured TD: 17588 ft. Vertical TD: 7245 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 4/1/2024 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 8/18/2022 | | Proposed Top PZ Location: | Sec:31 Twp: 1N 65W | Footage: 460 FSL 480 FEL | | Bottom Hole Location: | Sec:30 Twp: 1N 65W | Footage: 370 FNL 480 FEL | | Proposed Depth/Form: | 17274 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2957 , Unit Acreage: 2560, Drill Unit: 30-31E2 6-7ALL1-12E2 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2333 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 634, Top: 0 ft., Bottom: 2333 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17367 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2178, Top: 0 ft., Bottom: 17367 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/19/2022 | | Spud Date: | 8/30/2021 | Spud Date Is: | ACTUAL | | Measured TD: | 17588 ft. | Measured PB depth: | 17504 ft. | | True Vertical TD: | 7245 ft. | True Vertical PB depth: | 7247 ft. | | Top PZ Location: | Sec:31 Twp: 1N 65W | Footage: 490 FSL 529 FEL | | Bottom Hole Location: | Sec:30 Twp: 1N 65W | Footage: 372 FNL 487 FEL | | Log Types: | MWD/LWD,CBL, RES run on County Line 3112-01H (API 05-123-51171) | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2391 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1147, Top: 0 ft., Bottom: 2391 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17588 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2400, Top: 350 ft., Bottom: 17588 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 975 ft. | 1282 ft. | | | | PARKMAN | 4369 ft. | | | | | SUSSEX | 4739 ft. | | | | | SHANNON | 5201 ft. | | | | | SHARON SPRINGS | 7245 ft. | | | | | NIOBRARA | 7262 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 4/1/2024 Interval Top: 7805 ft. Interval Bottom: 17415 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/13/2022 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/5/2022 | Treatment End Date: | 5/14/2022 | | Treatment Summary: | FR Water 487467 bbl, Treated Water 11408 bbl, Fresh Water 2736 bbl (21,067,643 gals), 28% HCL 817 bbl.
Proppant:100 Mesh 3,651,880 lbs 40/70 White Sand 16,228,377 lb
Flowback is measured by strapping a flowback tank every hour during initial flowback and from tank gauges
during permanent facility flowback. | | Total fluid used in treatment (bbls): | 502428 | Max pressure during treatment (psi): | 12375 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 47 | | Total acid used in treatment (bbls): | 817 | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 24077 | | Fresh water used in treatment (bbls): | 501611 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 19880257 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7352 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/28/2022 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 710 | | BBLS_OIL | 375 | | BTU_GAS | 1516 | | CALC_BBLS_H2O | 710 | | CALC_BBLS_OIL | 375 | | CALC_GOR | 816 | | CALC_MCF_GAS | 306 | | CASING_PRESS | 2415 | | GRAVITY_OIL | 41 | | MCF_GAS | 306 | | TUBING_PRESS | 1653 |
| | Perforation Data: | | Interval Top: | 7805 ft. | # Of Holes: | 1735 | | Interval Bottom: | 17415 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 22028 |
| Total Gas Produced (MCF) | 215572 |
| GOR | 9786 |
| GOR Determination | BOE |
| Average BOE per Day | 162.579 |
| Average MCFE per Day | 942.972 |
| Federal Financial Assurance | i | |
|
|