|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 6/19/2022 Measured TD: 20015 ft. Vertical TD: 7183 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 6/19/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 4/13/2022 | | Proposed Top PZ Location: | Sec:22 Twp: 1N 65W | Footage: 470 FSL 1989 FWL | | Bottom Hole Location: | Sec:10 Twp: 1N 65W | Footage: 2175 FSL 1989 FWL | | Proposed Depth/Form: | 19942 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2903 , Unit Acreage: 800, Drill Unit: Sec.10: SW;15,22:W/2 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 878, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19942 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2233, Top: , Bottom: 19942 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/16/2021 | | Spud Date: | 5/17/2021 | Spud Date Is: | ACTUAL | | Measured TD: | 20015 ft. | Measured PB depth: | 19955 ft. | | True Vertical TD: | 7183 ft. | True Vertical PB depth: | 7191 ft. | | Top PZ Location: | Sec:22 Twp: 1N 65W | Footage: 468 FSL 2112 FWL | | Bottom Hole Location: | Sec:10 Twp: 1N 65W | Footage: 2237 FSL 2124 FWL | | Log Types: | GR, RES on 05-123-50942. Mud, CBL, MWD/GR | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1549 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 491, Top: 0 ft., Bottom: 1549 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 20004 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2900, Top: 1550 ft., Bottom: 20015 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 2714 ft. | 3067 ft. | | | | SUSSEX | 4699 ft. | 4862 ft. | | | | SHANNON | 5771 ft. | 5903 ft. | | | | NIOBRARA | 7176 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 6/19/2022 Interval Top: 7651 ft. Interval Bottom: 19943 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/18/2022 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 12/3/2021 | Treatment End Date: | 12/23/2021 | | Treatment Summary: | Performed 61 Stage Niobrara Frac, using a total of 15,347,730 lbs sand, Total Fluid used 440,701 bbls, Max PSI 8,384, total of 2,379 holes, Perf Diam. 0.32", total acid 1,010 bbls 15% HCI. | | Total fluid used in treatment (bbls): | 440701 | Max pressure during treatment (psi): | 8384 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 61 | | Total acid used in treatment (bbls): | 1010 | Min frac gradient (psi/ft): | 1.00 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 54142 | | Fresh water used in treatment (bbls): | 439691 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 15347730 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6980 ft. | | Tubing Packer Depth: | 6988 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/19/2022 | Test Method: | FLOWINg | | Hours Tested: | 1 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 22 | | BTU_GAS | 1301 | | CALC_BBLS_H2O | 168 | | CALC_BBLS_OIL | 528 | | CALC_GOR | 1000 | | CALC_MCF_GAS | 528 | | CASING_PRESS | 498 | | GRAVITY_OIL | 44 | | MCF_GAS | 22 | | TUBING_PRESS | 873 |
| | Perforation Data: | | Interval Top: | 7651 ft. | # Of Holes: | 2379 | | Interval Bottom: | 19943 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 10254 |
| Total Gas Produced (MCF) | 130524 |
| GOR | 12729 |
| GOR Determination | BOE |
| Average BOE per Day | 89.811 |
| Average MCFE per Day | 520.860 |
| Federal Financial Assurance | i | |
|
|