|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/3/2021 Measured TD: 13598 ft. Vertical TD: 7743 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/3/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/11/2021 | | Proposed Top PZ Location: | Sec:8 Twp: 1N 68W | Footage: 50 FSL 2615 FWL | | Bottom Hole Location: | Sec:8 Twp: 1N 68W | Footage: 50 FNL 2682 FWL | | Proposed Depth/Form: | 13636 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13626 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1600, Top: , Bottom: 13626 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/5/2020 | | Spud Date: | 10/12/2019 | Spud Date Is: | ACTUAL | | Measured TD: | 13598 ft. | Measured PB depth: | 13574 ft. | | True Vertical TD: | 7743 ft. | True Vertical PB depth: | 7743 ft. | | Top PZ Location: | Sec:8 Twp: 1N 68W | Footage: 128 FSL 2642 FWL | | Bottom Hole Location: | Sec:8 Twp: 1N 68W | Footage: 55 FNL 2666 FWL | | Log Types: | CBL, MWD/LWD. (GR/CNL in API 123-50510). | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1932 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 1932 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13588 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1158, Top: 1680 ft., Bottom: 13588 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 1078 ft. | | | | | PARKMAN | 4414 ft. | | | | | SUSSEX | 4779 ft. | | | | | SHARON SPRINGS | 7752 ft. | | | | | NIOBRARA | 7840 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 5/3/2021 Interval Top: 8398 ft. Interval Bottom: 13551 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/25/2021 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 2/23/2021 | Treatment End Date: | 2/28/2021 | | Treatment Summary: | PERF FROM 8398-13551
286 BBLS 20% HCR-7000 WL; 100 BBLS 7.5% HCL ACID; 6,018 BBLS PUMP DOWN; 141,349 BBLS SLICKWATER; 147,753 BBLS TOTAL FLUID. 4,152,354 LBS WHITE 40/70 OTTAWA/ST. PETERS; 4,152,354 LBS TOTAL PROPPANT.
| | Total fluid used in treatment (bbls): | 147753 | Max pressure during treatment (psi): | 8393 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 19 | | Total acid used in treatment (bbls): | 386 | Min frac gradient (psi/ft): | 0.85 | | Recycled water used in treatment (bbls): | 450 | Total flowback volume recovered (bbls): | 286 | | Fresh water used in treatment (bbls): | 146917 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 4152354 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7730 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/29/2021 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 282 | | BBLS_OIL | 207 | | BTU_GAS | 1258 | | CALC_BBLS_H2O | 282 | | CALC_BBLS_OIL | 207 | | CALC_GOR | 2957 | | CALC_MCF_GAS | 612 | | CASING_PRESS | 2500 | | GRAVITY_OIL | 51 | | MCF_GAS | 612 | | TUBING_PRESS | 1700 |
| | Perforation Data: | | Interval Top: | 8398 ft. | # Of Holes: | 576 | | Interval Bottom: | 13551 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 8494 |
| Total Gas Produced (MCF) | 72165 |
| GOR | 8495 |
| GOR Determination | BOE |
| Average BOE per Day | 57.370 |
| Average MCFE per Day | 332.786 |
| Federal Financial Assurance | i | |
|
|