Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50511
Well Classification: OW Status: PR - 5/3/2021
Well Name/No:MAE J #8-10HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/3/2021
FacilityID:467440LocationID:466612
Municipality/County:ERIE / WELD #123Location:SESW 8 1N68W 6
Field:WATTENBERG - #90750Elevation:5083 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:761FSL  2413 FWLLat/Long: 40.060340 / -105.028602Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.060336 / -105.028604Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/23/2021
End Date: 2/28/2021
Reported: 4/14/2021
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/3/2021             Measured TD: 13526 ft.    Vertical TD: 7618 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/3/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/11/2021
Proposed Top PZ Location:Sec:8 Twp: 1N 68W Footage: 50 FSL  1944 FEL
Bottom Hole Location:Sec:8 Twp: 1N 68W Footage: 50 FNL  2044 FEL
Proposed Depth/Form:13603 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 240, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13593 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1596, Top: , Bottom: 13593 ft.

Wellbore Completed
Completion Date:3/28/2020
Spud Date:10/10/2019Spud Date Is:ACTUAL
Measured TD:13526 ft.Measured PB depth:13501 ft.
True Vertical TD:7618 ft.True Vertical PB depth:7619 ft.
Top PZ Location:Sec:8 Twp: 1N 68WFootage: 208 FSL  1920 FEL
Bottom Hole Location:Sec:8 Twp: 1N 68WFootage: 55 FNL  2049 FEL
Log Types:CBL, MWD/LWD. (GR/CNL in API 123-50510).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1933 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 722, Top: 0 ft., Bottom: 1933 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13515 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1150, Top: 2070 ft., Bottom: 13515 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1078 ft.
PARKMAN4480 ft.
SUSSEX4858 ft.
SHARON SPRINGS7866 ft.
NIOBRARA7958 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/3/2021                  Interval Top: 8379 ft.    Interval Bottom: 13477 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/25/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/23/2021Treatment End Date:2/28/2021
Treatment Summary:PERF FROM 8379-13477 286 BBLS 20% HCR-7000 WL; 81 BBLS 7.5% HCL ACID; 5,865 BBLS PUMP DOWN; 138,850 BBLS SLICKWATER; 145,082 BBLS TOTAL FLUID. 4,110,456 LBS WHITE 40/70 OTTAWA/ST. PETERS; 4,110,456 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):145082Max pressure during treatment (psi):8001
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:19
Total acid used in treatment (bbls):367Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):2100Total flowback volume recovered (bbls):105
Fresh water used in treatment (bbls):142615Disposition method For flowback:RECYCLE
Total proppant used (lbs):4110456Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7757 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/1/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 112
BBLS_OIL 155
BTU_GAS 1258
CALC_BBLS_H2O 112
CALC_BBLS_OIL 155
CALC_GOR 1477
CALC_MCF_GAS 229
CASING_PRESS 2700
GRAVITY_OIL 51
MCF_GAS 229
TUBING_PRESS 2100
Perforation Data:
Interval Top:8379 ft.# Of Holes:570
Interval Bottom:13477 ft.Hole Size:0.39 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)4625
Total Gas Produced (MCF)71682
GOR15498
GOR DeterminationMCFE
Average BOE per Day46.566
Average MCFE per Day270.071

 Federal Financial Assurance  i 

 Tribal Well  i No