|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/20/2021 Measured TD: 16157 ft. Vertical TD: 7328 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/20/2021 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 9/6/2021 | | Proposed Top PZ Location: | Sec:30 Twp: 7N 66W | Footage: 404 FSL 2530 FEL | | Bottom Hole Location: | Sec:25 Twp: 7N 67W | Footage: 395 FSL 150 FWL | | Proposed Depth/Form: | 16180 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16191 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2175, Top: 2500 ft., Bottom: 16191 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/20/2020 | | Spud Date: | 1/26/2020 | Spud Date Is: | ACTUAL | | Measured TD: | 16157 ft. | Measured PB depth: | 16123 ft. | | True Vertical TD: | 7328 ft. | True Vertical PB depth: | 7328 ft. | | Top PZ Location: | Sec:30 Twp: 7N 66W | Footage: 415 FSL 2550 FWL | | Bottom Hole Location: | Sec:25 Twp: 7N 67W | Footage: 395 FSL 151 FWL | | Log Types: | MWD/LWD, Mud, CBL, RES in API 05-123-50408 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1556 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 397, Top: 0 ft., Bottom: 1556 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16150 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2470, Top: 2875 ft., Bottom: 16150 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4055 ft. | | N | N | | SUSSEX | 4665 ft. | | N | N | | SHANNON | 5320 ft. | | N | N | | SHARON SPRINGS | 7546 ft. | | N | N | | NIOBRARA | 7568 ft. | | N | N | | FORT HAYS | 8006 ft. | | N | N | | CODELL | 8170 ft. | | N | N |
Formation CODL Formation Classification: OW Status: PR - 8/20/2021 Interval Top: 8489 ft. Interval Bottom: 16052 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/20/2021 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 5/3/2021 | Treatment End Date: | 5/15/2021 | | Treatment Summary: | 321852 bbls total; 10302345 # sand total( 200/mesh 1073740 100/mesh 40/70 9228605 30/50); 6501.6 gals HCL
| | Total fluid used in treatment (bbls): | 321852 | Max pressure during treatment (psi): | 8952 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 38 | | Total acid used in treatment (bbls): | 155 | Min frac gradient (psi/ft): | 0.96 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 36228 | | Fresh water used in treatment (bbls): | 321697 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 10302345 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/20/2021 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1037 | | BBLS_OIL | 5 | | BTU_GAS | 1301 | | CALC_BBLS_H2O | 1037 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 4600 | | CALC_MCF_GAS | 23 | | CASING_PRESS | 2197 | | GRAVITY_OIL | 44 | | MCF_GAS | 23 |
| | Perforation Data: | | Interval Top: | 8489 ft. | # Of Holes: | 1216 | | Interval Bottom: | 16052 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 8323 |
| Total Gas Produced (MCF) | 40189 |
| GOR | 4828 |
| GOR Determination | BOE |
| Average BOE per Day | 41.908 |
| Average MCFE per Day | 243.068 |
| Federal Financial Assurance | i | |
|
|