Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50413
Well Classification: OW Status: PR - 8/26/2021
Well Name/No:COT West #V-30-25HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PRAIRIE OPERATING CO LLC - 10819
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/26/2021
FacilityID:466795LocationID:466071
County:WELD #123Location:NESW 30 7N66W 6
Field:WATTENBERG - #90750Elevation:4946 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2107FSL  1973 FWLLat/Long: 40.543832 / -104.824918Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.543830 / -104.824917Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/3/2021
End Date: 5/15/2021
Reported: 7/20/2021
Days to report: 66
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/26/2021             Measured TD: 16113 ft.    Vertical TD: 7243 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/26/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/15/2021
Proposed Top PZ Location:Sec:30 Twp: 7N 66W Footage: 570 FSL  2531 FEL
Bottom Hole Location:Sec:25 Twp: 7N 67W Footage: 560 FSL  150 FWL
Proposed Depth/Form:16062 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2874 , Unit Acreage: 480, Drill Unit: 25: S2, 30: SW4
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16068 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2154, Top: 2500 ft., Bottom: 16068 ft.

Wellbore Completed
Completion Date:2/10/2020
Spud Date:1/26/2020Spud Date Is:ACTUAL
Measured TD:16113 ft.Measured PB depth:16077 ft.
True Vertical TD:7243 ft.True Vertical PB depth:7243 ft.
Top PZ Location:Sec:30 Twp: 7N 66WFootage: 582 FSL  2560 FWL
Bottom Hole Location:Sec:25 Twp: 7N 67WFootage: 551 FSL  155 FWL
Log Types:MWD/LWD, Mud, CBL, RES in API 05-123-50408
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1566 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 397, Top: 0 ft., Bottom: 1566 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16103 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2425, Top: 1370 ft., Bottom: 16103 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4071 ft.NN
SUSSEX4713 ft.NN
SHANNON5379 ft.NN
SHARON SPRINGS7600 ft.NN
NIOBRARA7621 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/26/2021                 Interval Top: 8439 ft.    Interval Bottom: 16002 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/26/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/3/2021Treatment End Date:5/15/2021
Treatment Summary:320256 bbls total; 10308895 # sand total( 200/mesh 1077780 100/mesh 40/70 9231115 30/50); 5002.2 gals HCL
Total fluid used in treatment (bbls):320256Max pressure during treatment (psi):8523
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):1.02
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):29729
Fresh water used in treatment (bbls):320137Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10308895Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2021Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 792
BBLS_OIL 16
BTU_GAS 1301
CALC_BBLS_H2O 792
CALC_BBLS_OIL 16
CALC_GOR 1188
CALC_MCF_GAS 19
CASING_PRESS 1685
GRAVITY_OIL 44
MCF_GAS 19
Perforation Data:
Interval Top:8439 ft.# Of Holes:1216
Interval Bottom:16002 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)3913
Total Gas Produced (MCF)36487
GOR9324
GOR DeterminationBOE
Average BOE per Day27.805
Average MCFE per Day161.253

 Federal Financial Assurance  i 

 Tribal Well  i No