Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50405
Well Classification: OW Status: PR - 8/7/2021
Well Name/No:COT West #T-30-25HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PRAIRIE OPERATING CO LLC - 10819
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/7/2021
FacilityID:466787LocationID:466071
County:WELD #123Location:NESW 30 7N66W 6
Field:WATTENBERG - #90750Elevation:4946 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2137FSL  1973 FWLLat/Long: 40.543915 / -104.824917Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.543914 / -104.824916Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/15/2021
End Date: 5/28/2021
Reported: 7/20/2021
Days to report: 53
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/7/2021             Measured TD: 16044 ft.    Vertical TD: 7276 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/7/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/15/2021
Proposed Top PZ Location:Sec:30 Twp: 7N 66W Footage: 1115 FSL  2558 FWL
Bottom Hole Location:Sec:25 Twp: 7N 67W Footage: 1059 FSL  151 FWL
Proposed Depth/Form:16059 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2874 , Unit Acreage: 480, Drill Unit: 25: S2, 30: SW4
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 660, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16061 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2153, Top: 2500 ft., Bottom: 16061 ft.

Wellbore Completed
Completion Date:3/3/2020
Spud Date:1/28/2020Spud Date Is:ACTUAL
Measured TD:16044 ft.Measured PB depth:16006 ft.
True Vertical TD:7276 ft.True Vertical PB depth:7276 ft.
Top PZ Location:Sec:30 Twp: 7N 66WFootage: 1115 FSL  2558 FWL
Bottom Hole Location:Sec:25 Twp: 7N 67WFootage: 1059 FSL  151 FWL
Log Types:MWD/LWD, Mud, CBL, RES in API 05-123-50408
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1561 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 397, Top: 0 ft., Bottom: 1561 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16033 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2415, Top: 780 ft., Bottom: 16033 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3999 ft.NN
SUSSEX4528 ft.NN
SHANNON5198 ft.NN
SHARON SPRINGS7394 ft.NN
NIOBRARA7418 ft.NN
FORT HAYS7846 ft.NN
CODELL7955 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  PR - 8/7/2021                  Interval Top: 8368 ft.    Interval Bottom: 15932 ft.

 Completed Information for Formation CODELL
1st Production Date:8/7/2021Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/15/2021Treatment End Date:5/28/2021
Treatment Summary:321136 bbls total; 10098559 # sand total( 200/mesh 1078590 100/mesh 40/70 9019969 30/50); 9252.6 gals HCL
Total fluid used in treatment (bbls):321136Max pressure during treatment (psi):8922
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:38
Total acid used in treatment (bbls):220Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):16072
Fresh water used in treatment (bbls):320916Disposition method For flowback:DISPOSAL
Total proppant used (lbs):10098559Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/2021Test Method:FLOWING
Hours Tested:12Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 833
BBLS_OIL 84
BTU_GAS 1301
CALC_BBLS_H2O 833
CALC_BBLS_OIL 84
CALC_GOR 560
CALC_MCF_GAS 47
CASING_PRESS 2150
GRAVITY_OIL 44
MCF_GAS 47
Perforation Data:
Interval Top:8368 ft.# Of Holes:1216
Interval Bottom:15932 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)7259
Total Gas Produced (MCF)73572
GOR10135
GOR DeterminationBOE
Average BOE per Day54.600
Average MCFE per Day316.672

 Federal Financial Assurance  i 

 Tribal Well  i No