Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49914
Well Classification: OW Status: PR - 10/28/2019
Well Name/No:Coyote Trails #33S-20-1N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/28/2019
FacilityID:463044LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5273 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1149FSL  2301 FELLat/Long: 40.017977 / -105.007281Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017977 / -105.007282Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/28/2019
End Date: 8/6/2019
Reported: 9/26/2019
Days to report: 51
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/28/2019             Measured TD: 17953 ft.    Vertical TD: 7939 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/28/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/4/2021
Proposed Top PZ Location:Sec:33 Twp: 1N 68W Footage: 506 FNL  2601 FEL
Bottom Hole Location:Sec:4 Twp: 1S 68W Footage: 134 FSL  2037 FWL
Proposed Depth/Form:17872 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 520, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17872 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2386, Top: , Bottom: 17872 ft.

Wellbore Completed
Completion Date:6/22/2019
Spud Date:4/30/2019Spud Date Is:ACTUAL
Measured TD:17953 ft.Measured PB depth:17940 ft.
True Vertical TD:7939 ft.True Vertical PB depth:7939 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 506 FNL  2601 FEL
Bottom Hole Location:Sec:4 Twp: 1S 68WFootage: 134 FSL  2037 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1620 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1620 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17946 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2830, Top: 1766 ft., Bottom: 17953 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4574 ft.NN
SUSSEX4967 ft.NN
SHANNON5421 ft.NN
SHARON SPRINGS7767 ft.NN
NIOBRARA7895 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/28/2019                Interval Top: 8373 ft.    Interval Bottom: 17932 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/18/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/28/2019Treatment End Date:8/6/2019
Treatment Summary:Frac'd Niobrara with 48-stage plug-and-perf; 230551 total bbls fluid pumped: 211051 bbls gelled fluid and 19500 bbls fresh water; 9600035 total lbs proppant pumped: 4910025 lbs 40/70 mesh and 4690010 lbs 30/50 mesh.
Total fluid used in treatment (bbls):230551Max pressure during treatment (psi):8629
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7307
Fresh water used in treatment (bbls):19500Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9600035Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8194 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/28/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 532
BBLS_OIL 365
BTU_GAS 1300
CALC_BBLS_H2O 532
CALC_BBLS_OIL 365
CALC_GOR 2748
CALC_MCF_GAS 1003
CASING_PRESS 2399
GRAVITY_OIL 49
MCF_GAS 1003
TUBING_PRESS 1823
Perforation Data:
Interval Top:8373 ft.# Of Holes:1129
Interval Bottom:17932 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)7869
Total Gas Produced (MCF)117343
GOR14912
GOR DeterminationBOE
Average BOE per Day76.927
Average MCFE per Day446.152

 Federal Financial Assurance  i 

 Tribal Well  i No