Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49911
Well Classification: OW Status: PR - 10/14/2019
Well Name/No:Coyote Trails #33W-15-1N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/14/2019
FacilityID:463041LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5273 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1231FSL  2435 FELLat/Long: 40.018198 / -105.007761Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.018198 / -105.007763Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/1/2019
End Date: 9/10/2019
Reported: 9/26/2019
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/14/2019             Measured TD: 15477 ft.    Vertical TD: 7791 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/14/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/4/2021
Proposed Top PZ Location:Sec:33 Twp: 1N 68W Footage: 166 FNL  2444 FWL
Bottom Hole Location:Sec:32 Twp: 1N 68W Footage: 160 FNL  501 FWL
Proposed Depth/Form:15579 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15579 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2051, Top: , Bottom: 15579 ft.

Wellbore Completed
Completion Date:4/23/2019
Spud Date:3/27/2019Spud Date Is:ACTUAL
Measured TD:15477 ft.Measured PB depth:15453 ft.
True Vertical TD:7791 ft.True Vertical PB depth:7791 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 166 FNL  2444 FWL
Bottom Hole Location:Sec:32 Twp: 1N 68WFootage: 160 FNL  501 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1582 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1582 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15461 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2470, Top: 90 ft., Bottom: 15477 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4617 ft.NN
SUSSEX4942 ft.NN
SHANNON5640 ft.NN
SHARON SPRINGS7950 ft.NN
NIOBRARA8185 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/14/2019                Interval Top: 8292 ft.    Interval Bottom: 15453 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/4/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2019Treatment End Date:9/10/2019
Treatment Summary:Frac'd Niobrara with 36-stage plug-and-perf; 165094 total bbls fluid pumped: 155140 bbls gelled fluid and 9954 bbls fresh water; 7200420 total lbs proppant pumped: 3600355 lbs 40/70 mesh and 3600065 lbs 30/50 mesh.
Total fluid used in treatment (bbls):165094Max pressure during treatment (psi):8448
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:36
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):10376
Fresh water used in treatment (bbls):9954Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7200420Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8129 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/14/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 254
BBLS_OIL 311
BTU_GAS 1300
CALC_BBLS_H2O 254
CALC_BBLS_OIL 311
CALC_GOR 5537
CALC_MCF_GAS 1722
CASING_PRESS 2565
GRAVITY_OIL 49
MCF_GAS 1722
TUBING_PRESS 1743
Perforation Data:
Interval Top:8292 ft.# Of Holes:841
Interval Bottom:15453 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4612
Total Gas Produced (MCF)85849
GOR18614
GOR DeterminationMCFE
Average BOE per Day53.174
Average MCFE per Day308.402

 Federal Financial Assurance  i 

 Tribal Well  i No