Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49349
Well Classification: OW Status: PR - 8/1/2024
Well Name/No:STRIPES FEDERAL #LD18-760
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC76992
Facility Status:PRStatus Date8/1/2024
FacilityID:460407LocationID:460410
County:WELD #123Location:NENW 7 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4842 ft.
Planned Location:325FNL  2208 FWLLat/Long: 40.772060 / -103.909170Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.772068 / -103.909178Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/8/2019
End Date: 9/22/2019
Reported: 10/22/2019
Days to report: 30
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2024             Measured TD: 16714 ft.    Vertical TD: 5922 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/27/2020
Prop Depth/Form:16716 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-912 , Unit Acreage: 2560, Drill Unit: Sec 7, 8, 17, 18:ALL
Casing:String Type: CONDUCTOR, Hole Size: 36 in., Size: 26 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 144, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1850 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 658, Top: 0 ft., Bottom: 1850 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16716 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1807, Top: , Bottom: 16716 ft.

Wellbore Completed
Completion Date:8/13/2019
Spud Date:7/29/2019Spud Date Is:ACTUAL
Measured TD:16714 ft.Measured PB depth:16648 ft.
True Vertical TD:5922 ft.True Vertical PB depth:5922 ft.
Top PZ Location:Sec:7 Twp: 9N 58WFootage: 390 FNL  1981 FWLDepth
Bottom Hole Location:Sec:18 Twp: 9N 58WFootage: 141 FSL  1967 FWLDepth
Log Types:CBL, MWD/LWD, (Resistivity in 123-49351)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1958 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 671, Top: 0 ft., Bottom: 1958 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16695 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1691, Top: 2440 ft., Bottom: 16714 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3443 ft.
SUSSEX4082 ft.
TEEPEE BUTTES5273 ft.
SHARON SPRINGS6020 ft.
NIOBRARA6059 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/1/2024                  Interval Top: 6601 ft.    Interval Bottom: 16559 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/25/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/8/2019Treatment End Date:9/22/2019
Treatment Summary:Niobrara completed with 156 bbls 28% HCl, 458,038 bbls slurry, 1,695,450 lb 100 Mesh, 15,779,371 lb 40/70
Total fluid used in treatment (bbls):458194Max pressure during treatment (psi):8200
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:42
Total acid used in treatment (bbls):156Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):458038Disposition method For flowback:DISPOSAL
Total proppant used (lbs):17474821Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6259 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/20/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 921
BBLS_OIL 447
BTU_GAS 1345
CALC_BBLS_H2O 921
CALC_BBLS_OIL 447
CALC_GOR 535
CALC_MCF_GAS 239
CASING_PRESS 271
GRAVITY_OIL 42
MCF_GAS 239
TUBING_PRESS 625
Perforation Data:
Interval Top:6601 ft.# Of Holes:984
Interval Bottom:16559 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)19622
Total Gas Produced (MCF)68166
GOR3473
GOR DeterminationBOE
Average BOE per Day85.775
Average MCFE per Day497.491

 Federal Financial Assurance  i 

 Tribal Well  i No