|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/10/2020 Measured TD: 18138 ft. Vertical TD: 7483 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/10/2020 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/20/2020 | Proposed Top PZ Location: | Sec:15 Twp: 1N 66W | Footage: 758 FSL 1555 FEL | Bottom Hole Location: | Sec:3 Twp: 1N 66W | Footage: 300 FSL 1636 FEL | Proposed Depth/Form: | 18116 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 720, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18106 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 2148, Top: , Bottom: 18106 ft. |
| | |
Wellbore Completed | Completion Date: | 3/31/2019 | Spud Date: | 2/10/2019 | Spud Date Is: | ACTUAL | Measured TD: | 18138 ft. | Measured PB depth: | 18124 ft. | True Vertical TD: | 7483 ft. | True Vertical PB depth: | 7482 ft. | Top PZ Location: | Sec:15 Twp: 1N 66W | Footage: 710 FSL 1560 FEL | Bottom Hole Location: | Sec:3 Twp: 1N 66W | Footage: 287 S 1657 E | Log Types: | CBL, MWD/LWD. (GR/RES in API 123-49251). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1879 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 704, Top: 0 ft., Bottom: 1879 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18127 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1730, Top: 3694 ft., Bottom: 18127 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1700 ft. | | | | PARKMAN | 4512 ft. | | | | SUSSEX | 4908 ft. | | | | SHARON SPRINGS | 7434 ft. | | | | NIOBRARA | 7464 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 2/10/2020 Interval Top: 7924 ft. Interval Bottom: 18102 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/7/2019 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/9/2019 | Treatment End Date: | 10/18/2019 | Treatment Summary: | PERF FROM 7924-18102
719 BBLS 15% HCL ACID, 14,617 BBLS PUMP DOWN, 269,862 BBLS SLICKWATER, 285,198 BBLS TOTAL FLUID. 8,142,610 LBS WHITE 40/70 OTTAWA/ST. PETERS, 8,142,610 LBS TOTAL PROPPANT. | Total fluid used in treatment (bbls): | 285198 | Max pressure during treatment (psi): | 7741 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 38 | Total acid used in treatment (bbls): | 719 | Min frac gradient (psi/ft): | 0.90 | Recycled water used in treatment (bbls): | 2130 | Total flowback volume recovered (bbls): | 2827 | Fresh water used in treatment (bbls): | 282349 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 8142610 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7483 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/10/2020 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 119 | BBLS_OIL | 141 | BTU_GAS | 1280 | CALC_BBLS_H2O | 119 | CALC_BBLS_OIL | 141 | CALC_GOR | 1028 | CALC_MCF_GAS | 145 | CASING_PRESS | 1700 | GRAVITY_OIL | 48 | MCF_GAS | 145 | TUBING_PRESS | 1400 |
| Perforation Data: | Interval Top: | 7924 ft. | # Of Holes: | 1131 | Interval Bottom: | 18102 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 5408 |
Total Gas Produced (MCF) | 143278 |
GOR | 26493 |
GOR Determination | MCFE |
Average BOE per Day | 82.245 |
Average MCFE per Day | 477.043 |
Federal Financial Assurance | i | |
|
|