Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49220
Well Classification: OW Status: PR - 9/1/2019
Well Name/No:JDB #15-1HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2019
FacilityID:460160LocationID:460006
County:WELD #123Location:SESE 15 1N66W 6
Field:WATTENBERG - #90750Elevation:5156 ft.
Planned Location:625FSL  1098 FELLat/Long: 40.045725 / -104.757817Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.045725 / -104.757817Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/2/2019
End Date: 9/9/2019
Reported: 10/22/2019
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2019             Measured TD: 19005 ft.    Vertical TD: 7724 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/19/2020
Proposed Top PZ Location:Sec:15 Twp: 1N 66W Footage: 650 FSL  202 FEL
Bottom Hole Location:Sec:27 Twp: 1N 66W Footage: 470 FSL  203 FEL
Proposed Depth/Form:18948 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18938 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2250, Top: , Bottom: 18938 ft.

Wellbore Completed
Completion Date:6/6/2019
Spud Date:3/3/2019Spud Date Is:ACTUAL
Measured TD:19005 ft.Measured PB depth:18984 ft.
True Vertical TD:7724 ft.True Vertical PB depth:7724 ft.
Top PZ Location:Sec:15 Twp: 1N 66WFootage: 702 FSL  183 FEL
Bottom Hole Location:Sec:27 Twp: 1N 66WFootage: 472 S  194 E
Log Types:CBL, MWD/LWD. (GR/RES in API 123-49223).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1868 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 728, Top: 0 ft., Bottom: 1868 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18995 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1820, Top: 930 ft., Bottom: 19005 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1752 ft.
PARKMAN4632 ft.
SUSSEX5030 ft.
SHARON SPRINGS7470 ft.
NIOBRARA7499 ft.
FORT HAYS8027 ft.
CODELL8093 ft.
CARLILE8856 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/21/2019                Interval Top: 14094 ft.    Interval Bottom: 14225 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/21/2019Treatment End Date:N/A
Treatment Summary:14094-14225
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:14094 ft.# Of Holes:648
Interval Bottom:14225 ft.Hole Size:0.44 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/21/2019                Interval Top: 8858 ft.    Interval Bottom: 9000 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/21/2019Treatment End Date:N/A
Treatment Summary:8858-9000
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8858 ft.# Of Holes:648
Interval Bottom:9000 ft.Hole Size:0.44 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 11/5/2019                 Interval Top: 8171 ft.    Interval Bottom: 18957 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/24/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/2/2019Treatment End Date:9/9/2019
Treatment Summary:PERF FROM 8171-18957 249 BBLS 15% HCL ACID, 10,805 BBLS PUMP DOWN, 192,942 BBLS SLICKWATER, 203,996 BBLS TOTAL FLUID. 4,893,900 LBS WHITE 40/70 OTTAWA/ST. PETERS, 921,760 LBS WHITE 100 MESH, 5,815,660 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):203996Max pressure during treatment (psi):7853
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:27
Total acid used in treatment (bbls):249Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):2700Total flowback volume recovered (bbls):9588
Fresh water used in treatment (bbls):201047Disposition method For flowback:RECYCLE
Total proppant used (lbs):5815660Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7790 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/5/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 75
BBLS_OIL 167
BTU_GAS 1280
CALC_BBLS_H2O 75
CALC_BBLS_OIL 167
CALC_GOR 1036
CALC_MCF_GAS 173
CASING_PRESS 2400
GRAVITY_OIL 48
MCF_GAS 173
TUBING_PRESS 1900
Perforation Data:
Interval Top:8171 ft.# Of Holes:648
Interval Bottom:18957 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/21/2019                Interval Top: 8171 ft.    Interval Bottom: 18957 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/21/2019Treatment End Date:N/A
Treatment Summary:8171-8858, 9000-14094, 14225-18957
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8171 ft.# Of Holes:648
Interval Bottom:18957 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)9512
Total Gas Produced (MCF)136268
GOR14325
GOR DeterminationBOE
Average BOE per Day89.859
Average MCFE per Day521.162

 Federal Financial Assurance  i 

 Tribal Well  i No