|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2019 Measured TD: 19005 ft. Vertical TD: 7724 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2019 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/19/2020 | Proposed Top PZ Location: | Sec:15 Twp: 1N 66W | Footage: 650 FSL 202 FEL | Bottom Hole Location: | Sec:27 Twp: 1N 66W | Footage: 470 FSL 203 FEL | Proposed Depth/Form: | 18948 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 720, Drill Unit: GWA | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18938 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 2250, Top: , Bottom: 18938 ft. |
| | |
Wellbore Completed | Completion Date: | 6/6/2019 | Spud Date: | 3/3/2019 | Spud Date Is: | ACTUAL | Measured TD: | 19005 ft. | Measured PB depth: | 18984 ft. | True Vertical TD: | 7724 ft. | True Vertical PB depth: | 7724 ft. | Top PZ Location: | Sec:15 Twp: 1N 66W | Footage: 702 FSL 183 FEL | Bottom Hole Location: | Sec:27 Twp: 1N 66W | Footage: 472 S 194 E | Log Types: | CBL, MWD/LWD. (GR/RES in API 123-49223). | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1868 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 728, Top: 0 ft., Bottom: 1868 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 18995 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 1820, Top: 930 ft., Bottom: 19005 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS | 1752 ft. | | | | PARKMAN | 4632 ft. | | | | SUSSEX | 5030 ft. | | | | SHARON SPRINGS | 7470 ft. | | | | NIOBRARA | 7499 ft. | | | | FORT HAYS | 8027 ft. | | | | CODELL | 8093 ft. | | | | CARLILE | 8856 ft. | | | |
Formation FTHYS Formation Classification: OW Status: CM - 11/21/2019 Interval Top: 14094 ft. Interval Bottom: 14225 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/21/2019 | Treatment End Date: | N/A | Treatment Summary: | 14094-14225 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 14094 ft. | # Of Holes: | 648 | Interval Bottom: | 14225 ft. | Hole Size: | 0.44 in. |
|
Formation CARL Formation Classification: OW Status: CM - 11/21/2019 Interval Top: 8858 ft. Interval Bottom: 9000 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/21/2019 | Treatment End Date: | N/A | Treatment Summary: | 8858-9000 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 8858 ft. | # Of Holes: | 648 | Interval Bottom: | 9000 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 11/5/2019 Interval Top: 8171 ft. Interval Bottom: 18957 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 9/24/2019 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/2/2019 | Treatment End Date: | 9/9/2019 | Treatment Summary: | PERF FROM 8171-18957
249 BBLS 15% HCL ACID, 10,805 BBLS PUMP DOWN, 192,942 BBLS SLICKWATER, 203,996 BBLS TOTAL FLUID. 4,893,900 LBS WHITE 40/70 OTTAWA/ST. PETERS, 921,760 LBS WHITE 100 MESH, 5,815,660 LBS TOTAL PROPPANT. | Total fluid used in treatment (bbls): | 203996 | Max pressure during treatment (psi): | 7853 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 27 | Total acid used in treatment (bbls): | 249 | Min frac gradient (psi/ft): | 0.87 | Recycled water used in treatment (bbls): | 2700 | Total flowback volume recovered (bbls): | 9588 | Fresh water used in treatment (bbls): | 201047 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 5815660 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7790 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/5/2019 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 75 | BBLS_OIL | 167 | BTU_GAS | 1280 | CALC_BBLS_H2O | 75 | CALC_BBLS_OIL | 167 | CALC_GOR | 1036 | CALC_MCF_GAS | 173 | CASING_PRESS | 2400 | GRAVITY_OIL | 48 | MCF_GAS | 173 | TUBING_PRESS | 1900 |
| Perforation Data: | Interval Top: | 8171 ft. | # Of Holes: | 648 | Interval Bottom: | 18957 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/21/2019 Interval Top: 8171 ft. Interval Bottom: 18957 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 11/21/2019 | Treatment End Date: | N/A | Treatment Summary: | 8171-8858, 9000-14094, 14225-18957 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8171 ft. | # Of Holes: | 648 | Interval Bottom: | 18957 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 9512 |
Total Gas Produced (MCF) | 136268 |
GOR | 14325 |
GOR Determination | BOE |
Average BOE per Day | 89.859 |
Average MCFE per Day | 521.162 |
Federal Financial Assurance | i | |
|
|