Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-49216
Well Classification: OW Status: PR - 10/22/2019
Well Name/No:JDB #15-8HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/22/2019
FacilityID:460156LocationID:460006
County:WELD #123Location:SESE 15 1N66W 6
Field:WATTENBERG - #90750Elevation:5154 ft.
Planned Location:523FSL  1072 FELLat/Long: 40.045445 / -104.757728Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.045446 / -104.757728Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/6/2019
End Date: 8/17/2019
Reported: 10/3/2019
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/22/2019             Measured TD: 13874 ft.    Vertical TD: 7656 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/22/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/19/2020
Proposed Top PZ Location:Sec:14 Twp: 1N 66W Footage: 355 FSL  1492 FWL
Bottom Hole Location:Sec:11 Twp: 1N 66W Footage: 400 FSL  1517 FWL
Proposed Depth/Form:13935 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13925 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1637, Top: , Bottom: 13925 ft.

Wellbore Completed
Completion Date:7/5/2019
Spud Date:3/9/2019Spud Date Is:ACTUAL
Measured TD:13874 ft.Measured PB depth:13855 ft.
True Vertical TD:7656 ft.True Vertical PB depth:7656 ft.
Top PZ Location:Sec:14 Twp: 1N 66WFootage: 291 FSL  1438 FWL
Bottom Hole Location:Sec:11 Twp: 1N 66WFootage: 397 S  1524 W
Log Types:CBL, MWD/LWD. (GR/RES in API 123-49223).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 97 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 97 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1888 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 703, Top: 0 ft., Bottom: 1888 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13864 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1280, Top: 1390 ft., Bottom: 13874 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1753 ft.
PARKMAN4727 ft.
SUSSEX5157 ft.
SHARON SPRINGS7764 ft.
NIOBRARA7787 ft.
FORT HAYS8362 ft.
CODELL8459 ft.
CARLILE10268 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/21/2019                Interval Top: 10269 ft.    Interval Bottom: 11104 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/21/2019Treatment End Date:N/A
Treatment Summary:10269-11104
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10269 ft.# Of Holes:312
Interval Bottom:11104 ft.Hole Size:0.44 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/21/2019                Interval Top: 10064 ft.    Interval Bottom: 10151 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/21/2019Treatment End Date:N/A
Treatment Summary:10064-10151
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:10064 ft.# Of Holes:312
Interval Bottom:10151 ft.Hole Size:0.44 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/21/2019                Interval Top: 9845 ft.    Interval Bottom: 12367 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/21/2019Treatment End Date:N/A
Treatment Summary:9845-10064, 12316-12367
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9845 ft.# Of Holes:312
Interval Bottom:12367 ft.Hole Size:0.44 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/21/2019                Interval Top: 8485 ft.    Interval Bottom: 13827 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/21/2019Treatment End Date:N/A
Treatment Summary:8485-9845, 10151-10269, 11104-12316, 12367-13827
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8485 ft.# Of Holes:312
Interval Bottom:13827 ft.Hole Size:0.44 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 10/22/2019                Interval Top: 8485 ft.    Interval Bottom: 13827 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:9/24/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/6/2019Treatment End Date:8/17/2019
Treatment Summary:PERF FROM 8485-13827 185 BBLS 15% HCL ACID, 3,943 BBLS PUMP DOWN, 189,986 BBLS SLICKWATER, 194,114 BBLS TOTAL FLUID. 4,271,140 LBS WHITE 40/70 OTTAWA/ST. PETERS, 4,271,140 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):194114Max pressure during treatment (psi):7787
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):185Min frac gradient (psi/ft):0.75
Recycled water used in treatment (bbls):1050Total flowback volume recovered (bbls):8806
Fresh water used in treatment (bbls):192879Disposition method For flowback:RECYCLE
Total proppant used (lbs):4271140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7760 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/22/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 300
BBLS_OIL 95
BTU_GAS 1280
CALC_BBLS_H2O 300
CALC_BBLS_OIL 95
CALC_GOR 2084
CALC_MCF_GAS 198
CASING_PRESS 2200
GRAVITY_OIL 48
MCF_GAS 198
TUBING_PRESS 1500
Perforation Data:
Interval Top:8485 ft.# Of Holes:312
Interval Bottom:13827 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)5852
Total Gas Produced (MCF)93065
GOR15903
GOR DeterminationMCFE
Average BOE per Day59.727
Average MCFE per Day346.446

 Federal Financial Assurance  i 

 Tribal Well  i No