Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48939
Well Classification: OW Status: PR - 8/23/2023
Well Name/No:Guttersen #C28-755
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/23/2023
FacilityID:459549LocationID:459550
County:WELD #123Location:SESW 33 4N64W 6
Field:WATTENBERG - #90750Elevation:4723 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:317FSL  1537 FWLLat/Long: 40.262610 / -104.559850Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.262618 / -104.559867Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/27/2023
End Date: 6/12/2023
Reported: 7/27/2023
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/23/2023             Measured TD: 17086 ft.    Vertical TD: 6799 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/23/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/28/2024
Proposed Top PZ Location:Sec:33 Twp: 4N 64W Footage: 200 FSL  2300 FWL
Bottom Hole Location:Sec:28 Twp: 4N 64W Footage: 200 FNL  2297 FWL
Proposed Depth/Form:17566 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 173, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1750 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 630, Top: 0 ft., Bottom: 1750 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17566 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1939, Top: , Bottom: 17566 ft.

Wellbore Completed
Completion Date:9/24/2022
Spud Date:8/15/2022Spud Date Is:ACTUAL
Measured TD:17086 ft.Measured PB depth:17052 ft.
True Vertical TD:6799 ft.True Vertical PB depth:6799 ft.
Top PZ Location:Sec:33 Twp: 4N 64WFootage: 210 FSL  2246 FWL
Bottom Hole Location:Sec:28 Twp: 4N 64WFootage: 410 FNL  2304 FWL
Log Types:CBL, MWD/LWD, (IND in 123-13155)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 36.94 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1936 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 717, Top: 0 ft., Bottom: 1936 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17072 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1986, Top: 1030 ft., Bottom: 17072 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3680 ft.
SUSSEX4316 ft.
SHANNON4919 ft.
TEEPEE BUTTES5996 ft.
SHARON SPRINGS6744 ft.
NIOBRARA6835 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/23/2023                 Interval Top: 7416 ft.    Interval Bottom: 17010 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/21/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/27/2023Treatment End Date:6/12/2023
Treatment Summary:Niobrara completed with 503 bbls 28% HCL, 549,367 bbls slurry, 1,726,173 lb 100 mesh, 14,739,327 lb 40/70.
Total fluid used in treatment (bbls):549870Max pressure during treatment (psi):8534
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:46
Total acid used in treatment (bbls):503Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):549367Disposition method For flowback:DISPOSAL
Total proppant used (lbs):16465500Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7125 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/23/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 420
BBLS_OIL 229
BTU_GAS 1336
CALC_BBLS_H2O 420
CALC_BBLS_OIL 229
CALC_GOR 3397
CALC_MCF_GAS 778
CASING_PRESS 2812
GRAVITY_OIL 42
MCF_GAS 778
TUBING_PRESS 2025
Perforation Data:
Interval Top:7416 ft.# Of Holes:1316
Interval Bottom:17010 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)46617
Total Gas Produced (MCF)385492
GOR8269
GOR DeterminationBOE
Average BOE per Day310.043
Average MCFE per Day1798.264

 Federal Financial Assurance  i 

 Tribal Well  i No