Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48765
Well Classification: OW Status: PR - 7/21/2019
Well Name/No:Echeverria #2E-2H-D267
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/21/2019
FacilityID:459194LocationID:459170
County:WELD #123Location:NWNW 2 2N67W 6
Field:WATTENBERG - #90750Elevation:4882 ft.
Planned Location:898FNL  599 FWLLat/Long: 40.172031 / -104.864828Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.172030 / -104.864830Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/18/2019
End Date: 6/24/2019
Reported: 7/30/2019
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/21/2019             Measured TD: 12146 ft.    Vertical TD: 7273 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/21/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/22/2020
Proposed Top PZ Location:Sec:2 Twp: 2N 67W Footage: 480 FNL  482 FWL
Bottom Hole Location:Sec:2 Twp: 2N 67W Footage: 401 FSL  493 FWL
Proposed Depth/Form:12196 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2281 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 941, Top: 0 ft., Bottom: 2281 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12196 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1691, Top: , Bottom: 12196 ft.

Wellbore Completed
Completion Date:4/30/2019
Spud Date:1/31/2019Spud Date Is:ACTUAL
Measured TD:12146 ft.Measured PB depth:12121 ft.
True Vertical TD:7273 ft.True Vertical PB depth:7273 ft.
Top PZ Location:Sec:2 Twp: 2N 67WFootage: 480 FNL  482 FWL
Bottom Hole Location:Sec:2 Twp: 2N 67WFootage: 401 S  493 W
Log Types:MWD/LWD, Slim CBL, CBL (DIL in 123-20211, IND in 123-19854)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 44, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2324 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1042, Top: 0 ft., Bottom: 2324 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12135 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1631, Top: 2664 ft., Bottom: 12146 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4371 ft.NN
SHANNON4941 ft.NN
SHARON SPRINGS7239 ft.NN
NIOBRARA7387 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/21/2019                 Interval Top: 7779 ft.    Interval Bottom: 12111 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/29/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/18/2019Treatment End Date:6/24/2019
Treatment Summary:172048 bbls of water, 275 bbls of additives (FRP-4CS, Plexcide P5W, Tolcide TP5, SAFE-BFH-2, XLS-3Z, BHL-68, ACI-97, ASF-67, LGA-3J, Sodium Hypochlorite) and 18 bbl HCL in a 23 stage frac with 3602190 lbs of silica quartz proppant
Total fluid used in treatment (bbls):172341Max pressure during treatment (psi):8992
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:23
Total acid used in treatment (bbls):18Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):5616
Fresh water used in treatment (bbls):172323Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3602190Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7390 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/21/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 274
BBLS_OIL 284
BTU_GAS 1290
CALC_BBLS_H2O 274
CALC_BBLS_OIL 284
CALC_GOR 3570
CALC_MCF_GAS 1014
CASING_PRESS 2125
GRAVITY_OIL 43
MCF_GAS 1014
TUBING_PRESS 1100
Perforation Data:
Interval Top:7779 ft.# Of Holes:524
Interval Bottom:12111 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)2032
Total Gas Produced (MCF)64572
GOR31777
GOR DeterminationMCFE
Average BOE per Day36.058
Average MCFE per Day209.155

 Federal Financial Assurance  i 

 Tribal Well  i No