Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48752
Well Classification: OW Status: PR - 7/1/2019
Well Name/No:Echeverria #2C-2H-D267
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2019
FacilityID:459176LocationID:459170
County:WELD #123Location:NWNW 2 2N67W 6
Field:WATTENBERG - #90750Elevation:4883 ft.
Planned Location:898FNL  579 FWLLat/Long: 40.172032 / -104.864899Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.172030 / -104.864900Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/18/2019
End Date: 6/24/2019
Reported: 7/30/2019
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2019             Measured TD: 12379 ft.    Vertical TD: 7415 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/20/2020
Proposed Top PZ Location:Sec:2 Twp: 2N 67W Footage: 480 FNL  42 FWL
Bottom Hole Location:Sec:2 Twp: 2N 67W Footage: 454 FSL  67 FWL
Proposed Depth/Form:12358 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2285 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 943, Top: 0 ft., Bottom: 2285 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12358 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1715, Top: , Bottom: 12358 ft.

Wellbore Completed
Completion Date:5/11/2019
Spud Date:1/16/2019Spud Date Is:ACTUAL
Measured TD:12379 ft.Measured PB depth:12358 ft.
True Vertical TD:7415 ft.True Vertical PB depth:7415 ft.
Top PZ Location:Sec:2 Twp: 2N 67WFootage: 480 FNL  42 FWL
Bottom Hole Location:Sec:2 Twp: 2N 67WFootage: 454 S  67 W
Log Types:MWD/LWD, CBL (DIL in 123-20211, IND in 123-19854)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 44, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2340 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1023, Top: 0 ft., Bottom: 2340 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12373 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1653, Top: 2374 ft., Bottom: 12379 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4386 ft.NN
SHANNON4952 ft.NN
SHARON SPRINGS7211 ft.
NIOBRARA7321 ft.NN
FORT HAYS7741 ft.NN
CODELL8181 ft.NN
CARLILE10027 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 9/25/2019                 Interval Top: 10027 ft.    Interval Bottom: 10721 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/25/2019Treatment End Date:N/A
Treatment Summary:Carlile: 10027-10721
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10027 ft.# Of Holes:359
Interval Bottom:10721 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/25/2019                 Interval Top: 8181 ft.    Interval Bottom: 12272 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/25/2019Treatment End Date:N/A
Treatment Summary:Codell: 8181-10026, 10722-12272
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8181 ft.# Of Holes:359
Interval Bottom:12272 ft.Hole Size:0.42 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 7/21/2019                 Interval Top: 8015 ft.    Interval Bottom: 12272 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:7/29/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/18/2019Treatment End Date:6/24/2019
Treatment Summary:107512 bbls of water, 162 bbls of additives (FRP-4CS, Plexcide P5W, Tolcide TP5, ACI-97, ASF-67, Sodium Hypochlorite) and 12 bbl HCL in a 17 stage frac with 2687160 lbs of silica quartz proppant
Total fluid used in treatment (bbls):107686Max pressure during treatment (psi):8547
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:17
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8141
Fresh water used in treatment (bbls):107674Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2687160Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7652 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/21/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 317
BBLS_OIL 156
BTU_GAS 1276
CALC_BBLS_H2O 317
CALC_BBLS_OIL 156
CALC_GOR 3788
CALC_MCF_GAS 591
CASING_PRESS 1650
GRAVITY_OIL 43
MCF_GAS 591
TUBING_PRESS 750
Perforation Data:
Interval Top:8015 ft.# Of Holes:359
Interval Bottom:12272 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/25/2019                 Interval Top: 8015 ft.    Interval Bottom: 8180 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:9/25/2019Treatment End Date:N/A
Treatment Summary:Ft Hays: 8015-8180
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8015 ft.# Of Holes:359
Interval Bottom:8180 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)3967
Total Gas Produced (MCF)97243
GOR24512
GOR DeterminationMCFE
Average BOE per Day56.700
Average MCFE per Day328.877

 Federal Financial Assurance  i 

 Tribal Well  i No