Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48745
Well Classification: OW Status: PR - 7/24/2019
Well Name/No:Echeverria #2G-2H-D267
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/24/2019
FacilityID:459168LocationID:459170
County:WELD #123Location:NWNW 2 2N67W 6
Field:WATTENBERG - #90750Elevation:4882 ft.
Planned Location:898FNL  619 FWLLat/Long: 40.172031 / -104.864756Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.172030 / -104.864760Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/11/2019
End Date: 6/17/2019
Reported: 7/30/2019
Days to report: 43
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/24/2019             Measured TD: 12151 ft.    Vertical TD: 7278 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/24/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/20/2020
Proposed Top PZ Location:Sec:2 Twp: 2N 67W Footage: 542 FNL  1164 FWL
Bottom Hole Location:Sec:2 Twp: 2N 67W Footage: 466 FSL  1167 FWL
Proposed Depth/Form:12207 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2285 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 943, Top: 0 ft., Bottom: 2285 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12207 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1692, Top: , Bottom: 12207 ft.

Wellbore Completed
Completion Date:4/21/2019
Spud Date:1/29/2019Spud Date Is:ACTUAL
Measured TD:12151 ft.Measured PB depth:12124 ft.
True Vertical TD:7278 ft.True Vertical PB depth:7278 ft.
Top PZ Location:Sec:2 Twp: 2N 67WFootage: 542 FNL  1164 FWL
Bottom Hole Location:Sec:2 Twp: 2N 67WFootage: 466 S  1167 W
Log Types:MWD/LWD, CBL (DIL in 123-20211, IND in 123-19854)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 44, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2278 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1007, Top: 0 ft., Bottom: 2278 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12138 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1634, Top: 1040 ft., Bottom: 12151 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4390 ft.NN
SHANNON4950 ft.NN
TEEPEE BUTTES6366 ft.NN
SHARON SPRINGS7308 ft.NN
NIOBRARA7419 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 7/24/2019                 Interval Top: 7787 ft.    Interval Bottom: 12115 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/29/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/11/2019Treatment End Date:6/17/2019
Treatment Summary:180,840 bbls of water, 278 bbls of additives (FRP-4CS, PeroxyMAX, Plexcide P5W, SAFE-BFH-2, XLS-3Z, BHL-68, ACI-97, ASF-67, LGA-3J) and 83 bbl HCL in a 28 stage frac with 3989750 lbs of silica quartz proppant
Total fluid used in treatment (bbls):181201Max pressure during treatment (psi):8774
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):83Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):3695
Fresh water used in treatment (bbls):181118Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3989750Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7492 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/24/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 232
BBLS_OIL 301
BTU_GAS 1248
CALC_BBLS_H2O 232
CALC_BBLS_OIL 301
CALC_GOR 3339
CALC_MCF_GAS 1005
CASING_PRESS 2300
GRAVITY_OIL 43
MCF_GAS 1005
TUBING_PRESS 1200
Perforation Data:
Interval Top:7787 ft.# Of Holes:644
Interval Bottom:12115 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)1672
Total Gas Produced (MCF)62939
GOR37642
GOR DeterminationMCFE
Average BOE per Day34.225
Average MCFE per Day198.502

 Federal Financial Assurance  i 

 Tribal Well  i No