Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2025 Measured TD: 16486 ft. Vertical TD: 7585 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 11/1/2022 | | Proposed Top PZ Location: | Sec:26 Twp: 1N 66W | Footage: 796 FNL 1696 FEL | | Bottom Hole Location: | Sec:26 Twp: 1N 66W | Footage: 796 FNL 1696 FEL | | Proposed Depth/Form: | 16502 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: , Unit Acreage: 640, Drill Unit: GWA | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16492 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1951, Top: , Bottom: 16492 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/24/2021 | | Spud Date: | 1/4/2021 | Spud Date Is: | ACTUAL | | Measured TD: | 16486 ft. | Measured PB depth: | 16432 ft. | | True Vertical TD: | 7585 ft. | True Vertical PB depth: | 7584 ft. | | Top PZ Location: | Sec:26 Twp: 1N 66W | Footage: 2565 FNL 1563 FEL | | Bottom Hole Location: | Sec:23 Twp: 1N 66W | Footage: 52 FNL 1709 FEL | | Log Types: | | | Log Types: | CBL, LWD/MWD,Per Rule 317.p Exception, Resistivity Logs have been run on the BEIERLE 26-4HZ API#05-123-40875 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 27.17 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1898 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 808, Top: 0 ft., Bottom: 1898 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 16476 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1672, Top: 1160 ft., Bottom: 16486 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4842 ft. | | | | | SUSSEX | 5277 ft. | | | | | SHARON SPRINGS | 7915 ft. | | | | | NIOBRARA | 7930 ft. | | | | | FORT HAYS | 8416 ft. | | | | | CODELL | 8712 ft. | | | | | CARLILE | 15321 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 11/21/2024 Interval Top: 15321 ft. Interval Bottom: 15671 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 12/5/2024 | Treatment End Date: | N/A | | Treatment Summary: | Carlile perforated from 15,321'- 15,671'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 15321 ft. | # Of Holes: | 24 | | Interval Bottom: | 15671 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/21/2024 Interval Top: 8927 ft. Interval Bottom: 16371 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 12/5/2024 | Treatment End Date: | N/A | | Treatment Summary: | CODELL PERF GO FROM: 8,927-15,272 AND 16,120-16,371 | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8927 ft. | # Of Holes: | 420 | | Interval Bottom: | 16371 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 7/1/2025 Interval Top: 8527 ft. Interval Bottom: 16371 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 11/16/2021 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/21/2024 | Treatment End Date: | 6/22/2024 | | Treatment Summary: | Treatment Rate 2-16 bpm
Surfactant - 1877 gals
Acid Package - 5,712 gals
Biocide Package - 356 gals
Scale Inhibitor - 420 gals
Chemical Diverter - 100 Lbs
Linear Gel - 3 gals
Breaker - 10 lbs
Crosslinker - 0.5 gals
Total fluid w/ Water 15914.00 bbls
| | Total fluid used in treatment (bbls): | 15914 | Max pressure during treatment (psi): | 3580 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | 136 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 464 | | Fresh water used in treatment (bbls): | 15715 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 10/23/2021 | Treatment End Date: | 10/31/2021 | | Treatment Summary: | 57 BBL 7.5% HCL ACID; 4,259 BBL PUMP DOWN; 209,255 BBL SLICKWATER; 213,571 BBL TOTAL FLUID; 5,180,667 LBS WHITE 30/50 OTTAWA/ST. PETERS; 959,440 LBS WHITE 40/70 OTTAWA/ST. PETERS; 6,140,107 LBS TOTAL PROPPANT. | | Total fluid used in treatment (bbls): | 213571 | Max pressure during treatment (psi): | 7989 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 20 | | Total acid used in treatment (bbls): | 57 | Min frac gradient (psi/ft): | 0.89 | | Recycled water used in treatment (bbls): | 3300 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 210214 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 6140107 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 231 | | BBLS_OIL | 451 | | BTU_GAS | 1370 | | CALC_BBLS_H2O | 231 | | CALC_BBLS_OIL | 451 | | CALC_GOR | 905 | | CALC_MCF_GAS | 408 | | CASING_PRESS | 2100 | | GRAVITY_OIL | 50 | | MCF_GAS | 408 | | TUBING_PRESS | 1600 |
| | Perforation Data: | | Interval Top: | 8527 ft. | # Of Holes: | 492 | | Interval Bottom: | 16371 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 11/21/2024 Interval Top: 8527 ft. Interval Bottom: 8878 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 12/5/2024 | Treatment End Date: | N/A | | Treatment Summary: | Ft Hays perforated from 8,527'- 8,878' and 15,720'- 16,071'. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 8527 ft. | # Of Holes: | 24 | | Interval Bottom: | 8878 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 20439 |
| Total Gas Produced (MCF) | 83428 |
| GOR | 4081 |
| GOR Determination | BOE |
| Average BOE per Day | 96.767 |
| Average MCFE per Day | 561.245 |
| Federal Financial Assurance | i | |
|
|