Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48299
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:Dream Weaver North #3B-21H-N268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:458258LocationID:457515
Municipality/County:FREDERICK / WELD #123Location:SESW 21 2N68W 6
Field:WATTENBERG - #90750Elevation:4901 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1148FSL  1785 FWLLat/Long: 40.120037 / -105.011337Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.120040 / -105.011340Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/30/2020
End Date: 1/15/2021
Reported: 2/8/2021
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: WO - 1/1/2020             Measured TD: 19922 ft.    Vertical TD: 7422 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        WO - 1/1/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/18/2020
Proposed Top PZ Location:Sec:21 Twp: 2N 68W Footage: 1030 FSL  410 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 2180 FSL  480 FWL
Proposed Depth/Form:19884 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2194 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 849, Top: 0 ft., Bottom: 2194 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19884 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2858, Top: , Bottom: 19884 ft.

Wellbore Completed
Completion Date:10/23/2019
Spud Date:8/15/2019Spud Date Is:ACTUAL
Measured TD:19922 ft.Measured PB depth:3975 ft.
True Vertical TD:7422 ft.True Vertical PB depth:3881 ft.
Bottom Hole Location:Sec:16 Twp: 2N 68WFootage: 2178 FSL  363 FWL
Log Types:MWD, MUD, Surface MUD (IND in 123-20125)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2280 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 896, Top: 0 ft., Bottom: 2280 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 2280 ft., Depth: 19922 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 3841 ft., Depth: 4396 ft., Bottom: 4400 ft., Sacks: 217, Method:
Additional Cement:String Type: OPEN HOLE , Top: 4450 ft., Depth: 4923 ft., Bottom: 4923 ft., Sacks: 184, Method:
FormationInterval TopLog BottomCoredDSTs
SUSSEX4406 ft.NN
SHANNON4961 ft.NN
SHARON SPRINGS7380 ft.NN
NIOBRARA7467 ft.NN
FORT HAYS7936 ft.NN
CODELL7995 ft.NN
CARLILE8082 ft.NN
  No formation data to display.

Sidetrack #01             Wellbore Classification: OW             Status: EP - 10/23/2021             Measured TD: 6800 ft.    Vertical TD: 6624 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: OW        EP - 10/23/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/23/2021
Proposed Top PZ Location:Sec:21 Twp: 2N 68W Footage: 1030 FSL  410 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 2180 FSL  480 FWL
Proposed Depth/Form:19884 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2280 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 896, Top: 0 ft., Bottom: 2280 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19884 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2858, Top: , Bottom: 19884 ft.

Wellbore Completed
Completion Date:11/4/2019
Spud Date:8/15/2019Spud Date Is:ACTUAL
Measured TD:6800 ft.Measured PB depth:4111 ft.
True Vertical TD:6624 ft.True Vertical PB depth:4012 ft.
Bottom Hole Location:Sec:21 Twp: 2N 68WFootage: 315 FSL  578 FWL
Log Types:MWD/LWD, MUD, SONIC (IND in 123-20125)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2280 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 896, Top: 0 ft., Bottom: 2280 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 2280 ft., Depth: 6800 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 4111 ft., Depth: 4700 ft., Bottom: 4700 ft., Sacks: 217, Method:
Additional Cement:String Type: OPEN HOLE , Top: 4740 ft., Depth: 5300 ft., Bottom: 5300 ft., Sacks: 217, Method:
Additional Cement:String Type: OPEN HOLE , Top: 6128 ft., Depth: 6800 ft., Bottom: 6800 ft., Sacks: 217, Method:
  No formation data to display.

Sidetrack #02             Wellbore Classification: OW             Status: EP - 12/9/2021             Measured TD: 5150 ft.    Vertical TD: 5022 ft.

 Wellbore Data for Sidetrack #02Wellbore Classification: OW        EP - 12/9/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/9/2021
Proposed Top PZ Location:Sec:21 Twp: 2N 68W Footage: 1030 FSL  410 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 2180 FSL  480 FWL
Proposed Depth/Form:19884 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2280 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 896, Top: 0 ft., Bottom: 2280 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19884 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2858, Top: , Bottom: 19884 ft.

Wellbore Completed
Completion Date:12/23/2019
Spud Date:8/15/2019Spud Date Is:ACTUAL
Measured TD:5150 ft.Measured PB depth:4755 ft.
True Vertical TD:5022 ft.True Vertical PB depth:4636 ft.
Bottom Hole Location:Sec:21 Twp: 2N 68WFootage: 538 FSL  905 FWL
Log Types:MUD (IND in 123-15493)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2280 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 896, Top: 0 ft., Bottom: 2280 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 2280 ft., Depth: 5150 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 4755 ft., Depth: 5150 ft., Bottom: 5150 ft., Sacks: 131, Method:
  No formation data to display.

Sidetrack #03             Wellbore Classification: OW             Status: EP - 12/25/2021             Measured TD: 4960 ft.    Vertical TD: 4837 ft.

 Wellbore Data for Sidetrack #03Wellbore Classification: OW        EP - 12/25/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/25/2021
Proposed Top PZ Location:Sec:21 Twp: 2N 68W Footage: 1030 FSL  410 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 2180 FSL  480 FWL
Proposed Depth/Form:19884 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2280 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 896, Top: 0 ft., Bottom: 2280 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19884 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2858, Top: , Bottom: 19884 ft.

Wellbore Completed
Completion Date:12/26/2019
Spud Date:8/15/2019Spud Date Is:ACTUAL
Measured TD:4960 ft.Measured PB depth:4556 ft.
True Vertical TD:4837 ft.True Vertical PB depth:4443 ft.
Bottom Hole Location:Sec:21 Twp: 2N 68WFootage: 567 FSL  939 FWL
Log Types:MUD (IND in 123-15493)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2280 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 896, Top: 0 ft., Bottom: 2280 ft., Determination Method: VISU
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 2280 ft., Depth: 4960 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 4556 ft., Depth: 4960 ft., Bottom: 4960 ft., Sacks: 154, Method:
  No formation data to display.

Sidetrack #04             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 19922 ft.    Vertical TD: 7466 ft.

 Wellbore Data for Sidetrack #04Wellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:12/26/2021
Proposed Top PZ Location:Sec:21 Twp: 2N 68W Footage: 1030 FSL  410 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 2180 FSL  480 FWL
Proposed Depth/Form:19884 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: , Unit Acreage: 800, Drill Unit: GWA
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 800, Drill Unit: GWA
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: 800, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2280 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 896, Top: 0 ft., Bottom: 2280 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19884 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2858, Top: , Bottom: 19884 ft.

Wellbore Completed
Completion Date:1/5/2020
Spud Date:8/14/2019Spud Date Is:ACTUAL
Measured TD:19922 ft.Measured PB depth:19893 ft.
True Vertical TD:7466 ft.True Vertical PB depth:7466 ft.
Top PZ Location:Sec:21 Twp: 2N 68WFootage: 460 FSL  424 FWL
Bottom Hole Location:Sec:33 Twp: 2N 68WFootage: 2178 FSL  363 FWL
Log Types:MUD (IND in 123-20125)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2280 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 896, Top: 0 ft., Bottom: 2280 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19907 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2533, Top: 2470 ft., Bottom: 19922 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4406 ft.NN
SHANNON4961 ft.NN
SHARON SPRINGS7380 ft.NN
NIOBRARA7467 ft.NN
FORT HAYS7936 ft.NN
CODELL7995 ft.NN
CARLILE8082 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/11/2022                 Interval Top: 16647 ft.    Interval Bottom: 16952 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/2/2021Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/30/2020Treatment End Date:1/15/2021
Treatment Summary:Niobrara: 16647-16952
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:16647 ft.# Of Holes:907
Interval Bottom:16952 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/11/2022                 Interval Top: 16622 ft.    Interval Bottom: 17049 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/2/2021Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/30/2021Treatment End Date:1/15/2021
Treatment Summary:Ft Hays: 16622-16646, 16953-17049
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:16622 ft.# Of Holes:907
Interval Bottom:17049 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/11/2022                 Interval Top: 8765 ft.    Interval Bottom: 19676 ft.

 Completed Information for Formation CODELL
1st Production Date:4/2/2021Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/30/2021Treatment End Date:1/15/2021
Treatment Summary:Codell: 8765-11887, 11908-16573, 17050-19676
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8765 ft.# Of Holes:907
Interval Bottom:19676 ft.Hole Size:0.42 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/11/2022                 Interval Top: 8460 ft.    Interval Bottom: 19883 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/2/2021Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/30/2020Treatment End Date:1/15/2021
Treatment Summary:Carlile: 8460-8716, 11888-11907, 19677-19883
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8460 ft.# Of Holes:907
Interval Bottom:19883 ft.Hole Size:0.42 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 3/1/2025                  Interval Top: 8460 ft.    Interval Bottom: 19884 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/2/2021Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/30/2020Treatment End Date:1/15/2021
Treatment Summary:282874 bbls of water, 111 bbls of additives (FRP-22G, Bardac 2250M, Dixichlor Max, SAFE-BFH-2, XLS-3Z, BHL-68W, ACI-97, ASF-67) and 6 bbl HCL in a 39 stage frac with 20593 lbs of DFR-1X, 4790 lbs of PGA-4045, 2000 lbs of Calciium Chloride, and 6898395 lbs of silica quartz proppant. Oil and water are metered from flowback equipment. The daily water volumes are periodically checked against trucked volumes. All meters are calibrated before use on every pad.
Total fluid used in treatment (bbls):283023Max pressure during treatment (psi):8799
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:39
Total acid used in treatment (bbls):6Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):32Total flowback volume recovered (bbls):5946
Fresh water used in treatment (bbls):282985Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6898395Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7753 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/5/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 630
BBLS_OIL 225
BTU_GAS 1261
CALC_BBLS_H2O 630
CALC_BBLS_OIL 225
CALC_GOR 2747
CALC_MCF_GAS 618
GRAVITY_OIL 50
MCF_GAS 618
Perforation Data:
Interval Top:8460 ft.# Of Holes:907
Interval Bottom:19884 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)11087
Total Gas Produced (MCF)72419
GOR6531
GOR DeterminationBOE
Average BOE per Day64.110
Average MCFE per Day371.823

 Federal Financial Assurance  i 

 Tribal Well  i No