Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48297
Well Classification: OW Status: PR - 3/24/2021
Well Name/No:Dream Weaver North #3K-21H-N268
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/24/2021
FacilityID:458256LocationID:457515
Municipality/County:FREDERICK / WELD #123Location:SESW 21 2N68W 6
Field:WATTENBERG - #90750Elevation:4901 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1055FSL  1844 FWLLat/Long: 40.119783 / -105.011126Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.119780 / -105.011130Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/30/2020
End Date: 1/29/2021
Reported: 2/8/2021
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/24/2021             Measured TD: 19599 ft.    Vertical TD: 7305 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/24/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/18/2020
Proposed Top PZ Location:Sec:21 Twp: 2N 68W Footage: 1373 FSL  2502 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68W Footage: 2193 FSL  2469 FWL
Proposed Depth/Form:19557 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 800, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2170 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 841, Top: 0 ft., Bottom: 2170 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19557 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2808, Top: , Bottom: 19557 ft.

Wellbore Completed
Completion Date:1/29/2020
Spud Date:8/23/2019Spud Date Is:ACTUAL
Measured TD:19599 ft.Measured PB depth:19570 ft.
True Vertical TD:7305 ft.True Vertical PB depth:7305 ft.
Top PZ Location:Sec:21 Twp: 2N 68WFootage: 1373 FSL  2502 FWL
Bottom Hole Location:Sec:9 Twp: 2N 68WFootage: 2193 FSL  2469 FWL
Log Types:MWD/LWD (IND in API 123-20125)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 127 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 127 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2236 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 888, Top: 0 ft., Bottom: 2236 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19584 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2478, Top: 1872 ft., Bottom: 19599 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4285 ft.NN
SHANNON4906 ft.NN
SHARON SPRINGS7325 ft.NN
NIOBRARA7483 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 3/24/2021                 Interval Top: 8160 ft.    Interval Bottom: 19587 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/5/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/30/2020Treatment End Date:1/29/2021
Treatment Summary:453457 bbls of water, 215 bbls of additives (FRP-22G, Bardac 2250M, Dixichlor Max, Plexcide P5W, T-Chlor 12.5, SAFE-BFH-2, XLS-3Z, BHL-68W, BHL-68W-2, ACI-97, ASF-67) and 36 bbl HCL in a 56 stage frac with 35,141 lbs of DFR-1X, 14741 lbs of PGA-4045, and 7384260 lbs of silica quartz proppant. Oil and water are metered from flowback equipment. The daily water volumes are periodically checked against trucked volumes. All meters are calibrated before use on every pad.
Total fluid used in treatment (bbls):454085Max pressure during treatment (psi):9038
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:56
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):377Total flowback volume recovered (bbls):16293
Fresh water used in treatment (bbls):453672Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7384260Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7460 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/24/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 281
BBLS_OIL 375
BTU_GAS 1261
CALC_BBLS_H2O 281
CALC_BBLS_OIL 375
CALC_GOR 1317
CALC_MCF_GAS 494
CASING_PRESS 2600
GRAVITY_OIL 50
MCF_GAS 494
TUBING_PRESS 1575
Perforation Data:
Interval Top:8160 ft.# Of Holes:1354
Interval Bottom:19587 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)11169
Total Gas Produced (MCF)268745
GOR24061
GOR DeterminationMCFE
Average BOE per Day157.814
Average MCFE per Day915.321

 Federal Financial Assurance  i 

 Tribal Well  i No