Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-48252
Well Classification: OW Status: PR - 10/28/2019
Well Name/No:COYOTE TRAILS #33W-15-10C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/28/2019
FacilityID:458190LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5274 ft.
Planned Location:1149FSL  2337 FELLat/Long: 40.017977 / -105.007410Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017978 / -105.007408Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/15/2019
End Date: 8/22/2019
Reported: 9/26/2019
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/28/2019             Measured TD: 16807 ft.    Vertical TD: 8165 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/28/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:10/17/2020
Prop Depth/Form:16609 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBFHC , Formation: NIOBRARA-FT HAYS-CODELL , Order: 407-3177 , Unit Acreage: 700, Drill Unit: 1N68W S32 N2, N2N2S2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16817 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2232, Top: 1500 ft., Bottom: 16817 ft.

Wellbore Completed
Completion Date:7/2/2019
Spud Date:5/2/2019Spud Date Is:ACTUAL
Measured TD:16807 ft.Measured PB depth:16794 ft.
True Vertical TD:8165 ft.True Vertical PB depth:8165 ft.
Top PZ Location:Sec:33 Twp: 1N 68WFootage: 2502 FSL  2319 FELDepth
Bottom Hole Location:Sec:32 Twp: 1N 68WFootage: 2538 FSL  515 FWLDepth
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1639 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1640 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16796 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2670, Top: 1510 ft., Bottom: 16807 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5266 ft.NN
SUSSEX5703 ft.NN
SHANNON6443 ft.NN
SHARON SPRINGS8796 ft.NN
NIOBRARA8843 ft.NN
FORT HAYS10179 ft.NN
CODELL10194 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/15/2019                Interval Top: 15820 ft.    Interval Bottom: 16200 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:10/18/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/15/2019Treatment End Date:8/22/2019
Treatment Summary:Perforated Intervals: 15820'-15983'; 16199'-16200'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:15820 ft.# Of Holes:24
Interval Bottom:16200 ft.Hole Size:0.4 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/15/2019                Interval Top: 10208 ft.    Interval Bottom: 16783 ft.

 Completed Information for Formation CODELL
1st Production Date:10/18/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/15/2019Treatment End Date:8/22/2019
Treatment Summary:Perforated Intervals: 10208'-15796'; 16244'-16783'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:10208 ft.# Of Holes:703
Interval Bottom:16783 ft.Hole Size:0.4 in.

Formation NBFHC                   Formation Classification:  OW                   Status:  PR - 10/28/2019                Interval Top: 8895 ft.    Interval Bottom: 16783 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:10/18/2019Choke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/15/2019Treatment End Date:8/22/2019
Treatment Summary:Frac'd Niobrara-Fort Hays-Codell with 31-stage plug-and-perf; 110153 total bbls fluid pumped: 101619 bbls gelled fluid and 8534 bbls fresh water; 5812570 total lbs proppant pumped: all 30/50 sand.
Total fluid used in treatment (bbls):110153Max pressure during treatment (psi):9429
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:31
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):7258
Fresh water used in treatment (bbls):8534Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5812570Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8891 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/28/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 423
BBLS_OIL 287
BTU_GAS 1300
CALC_BBLS_H2O 423
CALC_BBLS_OIL 287
CALC_GOR 3467
CALC_MCF_GAS 995
CASING_PRESS 2501
GRAVITY_OIL 49
MCF_GAS 995
TUBING_PRESS 1946
Perforation Data:
Interval Top:8895 ft.# Of Holes:901
Interval Bottom:16783 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 11/15/2019                Interval Top: 8895 ft.    Interval Bottom: 16184 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/18/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/15/2019Treatment End Date:8/22/2019
Treatment Summary:Perforated Intervals: 8895'-10167'; 16007'-16184'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:8895 ft.# Of Holes:174
Interval Bottom:16184 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)10258
Total Gas Produced (MCF)141254
GOR13770
GOR DeterminationBOE
Average BOE per Day94.570
Average MCFE per Day548.486

 Federal Financial Assurance  i 

 Tribal Well  i No