Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-47757
Well Classification: OW Status: PR - 1/1/2019
Well Name/No:Melbon Ranch #4D-17H-M265
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2019
FacilityID:457075LocationID:428103
County:WELD #123Location:SWSW 17 2N65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4956 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1265FSL  219 FWLLat/Long: 40.134825 / -104.696636Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.134810 / -104.696623Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/10/2018
End Date: 12/16/2018
Reported: 4/11/2019
Originally Reported: 3/20/2019
Days to report: 116
Days to report: 94
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2019             Measured TD: 12196 ft.    Vertical TD: 7300 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2019
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/30/2020
Proposed Top PZ Location:Sec:17 Twp: 2N 65W Footage: 2423 FSL  489 FWL
Bottom Hole Location:Sec:17 Twp: 2N 65W Footage: 2401 FSL  466 FEL
Proposed Depth/Form:12217 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CLCDFH, Formation: CARLILE-CODELL-FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42.09 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2378 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 976, Top: 0 ft., Bottom: 2378 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12217 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1694, Top: , Bottom: 12217 ft.

Wellbore Completed
Completion Date:10/3/2018
Spud Date:9/15/2018Spud Date Is:ACTUAL
Measured TD:12196 ft.Measured PB depth:12172 ft.
True Vertical TD:7300 ft.True Vertical PB depth:7300 ft.
Top PZ Location:Sec:17 Twp: 2N 65WFootage: 2423 FSL  489 FWL
Bottom Hole Location:Sec:17 Twp: 2N 65WFootage: 2401 FSL  466 FEL
Log Types:MUD, MWD/LWD, CBL (DIL in 123-22921, IND in 123-18951)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 78, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2442 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1048, Top: 0 ft., Bottom: 2450 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12186 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1550, Top: 2010 ft., Bottom: 12196 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4183 ft.NN
SHANNON5139 ft.NN
TEEPEE BUTTES6347 ft.NN
SHARON SPRINGS7127 ft.NN
NIOBRARA7187 ft.NN
FORT HAYS7697 ft.NN
CODELL9200 ft.NN
CARLILE11044 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 8/20/2020                 Interval Top: 11044 ft.    Interval Bottom: 11349 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/20/2020Treatment End Date:N/A
Treatment Summary:Carlile Perfs: 11044-11349
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:11044 ft.# Of Holes:379
Interval Bottom:11349 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 8/20/2020                 Interval Top: 8420 ft.    Interval Bottom: 9019 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/20/2020Treatment End Date:N/A
Treatment Summary:Ft Hays perfs: 8420-9019
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8420 ft.# Of Holes:379
Interval Bottom:9019 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 2/17/2019                 Interval Top: 7833 ft.    Interval Bottom: 12163 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/7/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/10/2018Treatment End Date:12/16/2018
Treatment Summary:899311 bbls of water, 1344 bbls of additives (FRP-4CS, SAFE-BFH, XLS-3Z, BHL-68W, ACI-97, ASF-67, LGA-3J) and 455 bbl HCL in a 17 stage frac with 2516400 lbs of silica quartz proppant
Total fluid used in treatment (bbls):901110Max pressure during treatment (psi):9104
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:17
Total acid used in treatment (bbls):455Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):8832
Fresh water used in treatment (bbls):900655Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2516400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7483 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/17/2019Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 250
BBLS_OIL 232
BTU_GAS 1384
CALC_BBLS_H2O 250
CALC_BBLS_OIL 232
CALC_GOR 3393
CALC_MCF_GAS 788
CASING_PRESS 2000
GRAVITY_OIL 49
MCF_GAS 788
TUBING_PRESS 1000
Perforation Data:
Interval Top:7833 ft.# Of Holes:379
Interval Bottom:12163 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 8/20/2020                 Interval Top: 7833 ft.    Interval Bottom: 12163 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/20/2020Treatment End Date:N/A
Treatment Summary:Codell Perfs: 7833-8419, 9200-11043, 11350-12163
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7833 ft.# Of Holes:379
Interval Bottom:12163 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1946
Total Gas Produced (MCF)25325
GOR13013
GOR DeterminationBOE
Average BOE per Day17.290
Average MCFE per Day100.309

 Federal Financial Assurance  i 

 Tribal Well  i No